HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Electrical Technology 2020-5-22

2020-05-22View Original

Thread Content

This post was last edited by sdscj0122 on 2020-5-22 08:23. It deals with multiple-choice questions from the \"Electrical Safety Work Procedures\"; please indicate whether the answer is correct or incorrect. 3 points are awarded for correct answers, 2 points for incorrect ones, and 5 points for a detailed explanation of the reason. Bays that are ready for use (those in which the busbar connection strips or wires have been connected to the busbars, but the outgoing cables or devices have not yet been installed) should have names and numbers, and shall be included within the scope of dispatching management. The operating handle of its isolating switch and the access door should be locked. ()Error

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.