Cable tray routing design issues

2021-01-15View Original

Thread Content

I’m seeking advice from fellow maritime professionals. In an ethylene project, there is a substation located within the equipment; it is required that the 35KV incoming cables be run in separate cable trays, and not placed in the same tray as the cables that supply power to the equipment (10KV, 0.4KV). Are there any regulatory requirements for this?
Reply #22021-01-15
There is no regulatory prohibition. If conditions are limited, fixed partitions can be installed within the same cable tray.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.