HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Maintenance cycle for electrical equipment

2022-07-01View Original

Thread Content

The equipment in the plant includes gas generators, high and low voltage equipment, 400V/11KV transformers, as well as 11KV/33KV overhead power transmission lines. I would like to know what are the typical maintenance and repair cycles for the electrical equipment and overhead power transmission lines in such plants.
Reply #22022-07-14
DL 596-2021:D
Reply #32022-07-14
Regarding the maintenance cycle for distribution equipment, the relevant provisions in standards such as \"DLT 573-2021 Guidelines for the Maintenance of Power Transformers\", \"DLT 1753-2017 Procedures for Maintenance and Testing of Distribution Equipment\", \"DLT 724-2021 Technical Regulations for the Operation and Maintenance of Battery DC Power Supplies in Power Systems\", and \"DLT 741-2019 Operating Regulations for Overhead Transmission Lines\" should be followed!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.