HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The temperature is high after high-pressure air cooling in hydrocracking; is it feasible to replace the fan motor?

2018-05-17View Original

Thread Content

The temperature is high after high-pressure air cooling in hydrocracking; is it feasible to replace the fan motor?
Reply #22018-05-17
Is there any bias flow or air resistance? Equipment improvements can meet the process requirements to a certain extent, but it’s best to examine whether there are any effective adjustments that can further improve the process!
Reply #32018-05-17
First, find out the cause; if it’s because the motor is too small, it’s not too late to replace it then.
Reply #42018-05-21
Personal analysis is likely not very useful. 1. In air-cooling systems, finned tubes are used, so the heat exchange area cannot be increased. 2. The fan blades in air-cooling units follow specific design standards, with a fixed rotation speed per minute; increasing the motor speed poses safety risks. 3. It is necessary to check whether the temperature difference between the inlet and outlet of the air cooler meets the design requirements. 4. It is important to ensure that the water flow rate before the air cooler is stable, and to check for the formation of ammonium salts; this can be done by examining whether there are significant temperature differences across each cooler unit

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.