HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

vent pipe

2018-06-04View Original

Thread Content

The bottom of the existing exhaust pipe is secured with M24 foot bolts; the diameter of the pipe increases from bottom to top as DN250*10, DN219*10, DN159*8, and DN76*6. The total height of the pole is 17 meters! The lengths of each tube, from bottom to top, are 2480, 4900, 6000, and 3400 respectively. May I ask if such a vent pipe can be used without a restraining rope?
Reply #22018-06-22
Are there any operating procedures for the gas holder? Let’s draw on this experience to prepare the documents before the installation starts.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.