Question 1: What is the designed temperature of the process gas at the waste heat boiler of the reaction furnace? Why? What does it indicate if there is a significant drop or rise in this temperature? Answer: The designed temperature of the process gas at the outlet of the reactor waste heat boiler is 318°C. Given the designed concentration of acidic gases and the operating load, this temperature prevents sulfur from condensing at the outlet of the reactor waste heat boiler. Therefore, the heat exchange area of the waste heat boiler was calculated to ensure that the temperature remains at 318°C under the designed load of the plant. If there is a significant drop in temperature, and such a drop occurs over a short period of time, it may indicate that the tube bank in the reactor’s waste heat boiler has burst; this situation requires prompt verification and handling ; Under normal operating load of the plant, if this temperature rises significantly, it indicates a decrease in the heat exchange efficiency of the reactor’s waste heat boiler; this could be due to scaling on the tubes of the waste heat boiler, which reduces its heat exchange efficiency.
Reply #22018-12-18
The designed temperature of the process gas at the outlet of the reactor waste heat boiler is 318°C.
Reply #32018-12-18
The designed temperature of the process gas at the outlet of the reactor waste heat boiler is 318°C. Given the designed concentration of acidic gases and the load in the system, a temperature of 318°C at the outlet of the reactor waste heat boiler prevents sulfur from condensing. Therefore, the heat exchange area of the waste heat boiler was calculated to ensure that this temperature remains at 318°C under the designed load of the system. If there is a significant drop in temperature, and such a drop occurs over a short period of time, it may indicate that the tube bank in the reactor’s waste heat boiler has burst; this situation requires prompt verification and handling ; Under normal operating load of the plant, if this temperature rises significantly, it indicates a decrease in the heat transfer efficiency of the reactor’s waste heat boiler; this may be due to scaling on the tubes of the waste heat boiler, which reduces its heat transfer efficiency
Reply #42018-12-19
Answer: The designed temperature of the process gas at the outlet of the waste heat boiler in the reaction furnace is 318°C, as the acidic gas in the system is designed to be at this temperature
Reply #52020-04-02
The designed temperature of the process gas at the outlet of the reactor waste heat boiler is 318°C. Given the designed concentration of acidic gases and the load in the system, a temperature of 318°C at the outlet of the reactor waste heat boiler prevents sulfur from condensing. Therefore, the heat exchange area of the waste heat boiler was calculated to ensure that this temperature remains at 318°C under the designed load of the system. If there is a significant drop in temperature, and such a drop occurs over a short period of time, it may indicate that the tube bank in the reactor’s waste heat boiler has burst; this situation requires prompt verification and handling ; Under normal operating load of the plant, if this temperature rises significantly, it indicates a decrease in the heat transfer efficiency of the reactor’s waste heat boiler; this may be due to scaling on the tubes of the waste heat boiler, which reduces its heat transfer efficiency

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.