I would like to ask the experts: what is the general process in the preliminary design phase of engineering design projects? It’s my first time being a project leader; I don’t know where to start What to do down there?
Reply #22017-01-24
The project manager doesn’t deal with this; it’s the project plan that handles it.
Reply #32017-01-24
(1) Form a project design team: The design manager determines the scope of the design work in accordance with the requirements of the design contract, identifies the necessary specialties for the design department, and works together with the design office to agree on the persons in charge of each specialty as well as the key designers, thereby forming the project design team. (2) Submission of the preliminary main items list and equipment list: The design manager shall organize the relevant professionals to study the contract requirements, the feasibility study report, and the approvals from higher authorities; if any issues arise, solutions should be proposed. b Submit the preliminary main items list and equipment list. (3) Implementing design basis documents: The design manager organizes the review of the completeness and accuracy of the design basis documents officially provided by the client as well as external agreements, collects relevant information, and proposes methods for addressing the items that still need to be addressed. b The design manager assigns the responsible professionals to prepare the project design data based on the design foundation materials. (4) Submission of the preliminary schedule: The design manager organizes a discussion among the project leaders and planning engineers regarding the design timeline, and the planning engineer prepares a schedule for the design phase (an initial plan that includes dates for the release of key documents related to the design milestones).   (5) Manpower load estimation: a The design manager, together with the responsible professionals, estimates the manpower load for each specialty, as well as the dates for deployment and withdrawal, and determines the workload. b The design manager, in conjunction with the design department and design studios, determines all the personnel involved in the design. The design commencement report (or design plan, which represents a more detailed version of the project manager’s project plan in terms of engineering design) is prepared by the design manager with the assistance of the supervisors for each specialty, and is approved by the project manager.
Reply #42017-01-25
One can still be a project leader without understanding the work process. Your company is really bold. . .
Reply #52017-01-25
Do it slowly. . There are many colleagues from engineering companies and design institutes on the forum. Humbly ask for advice* Bar
Reply #62017-01-26
There is always a process; everyone learns by doing. Of course, the company needs to provide relevant training.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.