Can the storage and transportation tank area have its foundation laid first and construction carried out later?

2017-02-04View Original

Thread Content

There is such a tank farm that, due to production capacity constraints, can be developed in phases one and two. But the jars from phase one and phase two are together and mixed together. But for the convenience of construction, could all the tank foundations be prepared first? The tanks on the ground surface can be constructed in phase one, with phase two carried out after half a year or a year. I’m not sure if this will work. Still, do Phase 1 first; for Phase 2, both the foundation and the tank will be constructed in Phase 2. Note: The foundation must be subjected to dynamic compaction before construction. It is not possible to carry out additional compaction if there are any changes to the foundation during the second phase of construction.
Reply #22017-02-05
This saves a lot of trouble – it covers the entire contract.
Reply #32017-02-06
Sure, everything related to the cofferdam can be prepared in advance.
Reply #42017-02-07
It probably isn’t that good; if there’s a problem with the foundation due to some accident, it becomes very troublesome
Reply #52017-02-15
As long as your civil engineering work is of decent quality, there’s no problem; we also carry out the work in two stages here

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.