HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues regarding pipeline installation costs in Shandong’s 2015 installation quota

2017-07-18View Original

Thread Content

I would like to ask about the costs associated with pipe installation in Shandong’s installation quotas for 2015. For example, regarding the installation cost of the fitting with quota number 6-790, is that the same cost applied if there are ten elbows? Do I need to multiply by 2? Is it the same cost for an equal-diameter tee? Or should it be multiplied by 3?
Reply #22021-10-22
Fittings already include elbows and tees, so there is no need to multiply by 2 or 3

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.