HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Shida Shenghua has obtained a patent for a nitrogen sealing device for new types of methyl ethyl carbonate storage tanks, which helps maintain stable air pressure inside the tanks

2025-08-21View Original

Thread Content

Shida Shenghua has obtained a patent for a new nitrogen sealing device for methyl ethyl carbonate storage tanks, which helps maintain stable pressure inside the tanks. According to information from the Intellectual Property Office, Dongying Shida Shenghua New Materials Co., Ltd. has been granted a patent titled “New Nitrogen Sealing Device for Methyl Ethyl Carbonate Storage Tanks”; the approval number is CN223242524U, and the application was submitted in November 2024. The patent abstract indicates that this utility model discloses a new type of nitrogen sealing device for methyl ethyl carbonate storage tanks. It includes a tank body; a feed pipe is fixed at the upper end of the tank body, a pressure gauge is also fixed at the upper end of the same tank body. An nitrogen inlet pipe is fixed on one side of the upper end of the tank body, while an nitrogen outlet pipe is fixed on the other side. A backup nitrogen regulation mechanism is provided on the outer wall of the tank body. This utility model is equipped with a backup nitrogen regulation mechanism; in the event that the first nitrogen control valve and the second control valve become damaged, the third and fourth pressure transmitters can be used to activate this backup mechanism, thereby maintaining stable air pressure inside the tank. This prevents air from entering the tank, which could affect the quality and safety of ethyl methyl carbonate. It also improves the airtightness of the tank, ensuring the safety of ethyl methyl carbonate during transportation and storage.
Reply #22025-08-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first intelligent painting production line for offshore oil and gas equipment in China was put into use from 2029 to 2025: https://bbs.hcbbs.com/thread-5699156-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-08-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first intelligent painting production line for offshore oil and gas equipment in China was put into use from 2029 to 2025: https://bbs.hcbbs.com/thread-5699156-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-08-22
【Ten Years of Rapid Development in Chemical Processing Equipment】Successful Installation of Core Equipment for the World’s First 1,000-ton Pilot Plant for Green Hydrogen Jet Fuel, 2630–2025 https://bbs.hcbbs.com/thread-5699223-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-08-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】2631-2025: High-altitude welding robots made in Chengdu with steel structures https://bbs.hcbbs.com/thread-5699236-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-08-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first offshore substation equipped with a weather radar in China was installed at the 800-megawatt offshore wind power project in Dafeng, Jiangsu, from 2632 to 2025. https://bbs.hcbbs.com/thread-5699296-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-08-25
【The Defunct Fertilizer Plant】Jiangxi No. 2 Fertilizer Plant, which used coke oven gas and blast furnace gas from Xinyu Iron and Steel Plant as raw materials for production. https://bbs.hcbbs.com/thread-5699412-1-1.html (Source: Haichuan Chemical Forum)
Reply #82025-08-26
【Ten Years of Rapid Development in Chemical Equipment】2633-2025: Jilin Petrochemical’s world’s first million-ton-scale diesel adsorption separation unit was successfully commissioned on its first attempt https://bbs.hcbbs.com/thread-5699500-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-08-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】2635–2025: China’s Self-constructed Largest-tonnage, Highest Gas Storage Capacity New Marine Floating Natural Gas Liquefaction Plants https://bbs.hcbbs.com/thread-5699787-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-08-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】2643-2025: China Becomes the First Country in the World to Achieve Large-Scale Thermal Recovery of Heavy Oil at Sea ** https://bbs.hcbbs.com/thread-5700272-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-08-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 30MW-class pure hydrogen gas turbine, \"Jupiter-1\", was successfully shipped out 2579-2025 https://bbs.hcbbs.com/thread-5697796-1-1.html (Source: Haichuan Chemical Engineering Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.