Can cable trays be installed on the ground within the storage and transportation tank area?

2017-11-22View Original

Thread Content

There has been ongoing debate regarding whether overhead cable trays can be installed in storage and transfer tank areas. During the expert safety inspection, it was recommended that the cable trays located on the ground within the existing tank area be moved outside the fire dike; the cables inside the fire dike should be laid underground, while those outside the dike should be installed in cable trays on the ground surface (in the Liaoning region, Article 12.2 of the \"Technical Specifications for Fire Safety in Petrochemical Storage Sites\" DB21/T1972-2012 applies). Just to get things started – those who have experience with cable laying in tank areas, please share it.
Reply #22017-11-22
I need to use it here; no problem. The tank area is mainly filled with signal wires; what is your cable used for?
Reply #32017-11-22
Our trough boxes are located outside the tank farm cofferdam (wall), with cables laid at a high level using protective pipe racks inside. The work safety and fire department raised no issues.
Reply #42017-11-22
It’s mainly the signal cables on the storage tank
Reply #52017-11-22
Is your tank farm located within Liaoning Province?
Reply #62017-11-22
Is it to implement the \"Code for Design of Oil Depots\" GB 50074-2014?
Reply #72017-11-23
That definitely won’t be a problem. Don’t worry! Unless there are requirements in your area, then there’s nothing you can do.
Reply #82017-11-23
In 2012, the **State Administration of Work Safety issued a document titled \"Notice on Organizing Special Inspections for the Safety of Oil Storage Facilities\" (Document No. An Jian Zong Ting Guan San 57). Under the section \"II. Scope of Inspection and Key Points: (II) Key Points: 2. Oil storage facilities under construction: (5) Whether the electrical and instrumentation systems have been constructed in accordance with design requirements; whether measures have been taken to enhance the reliability of critical power supply systems; whether automatic interlock mechanisms are in place to shut down the systems when the liquid level is too high or too low; whether the power cables and control cables entering the storage area are laid underground; whether systems for automatic detection and alarm of leaks and fires are installed; and whether an industrial television monitoring system is in place.\" ”Since this document was issued, experts pay attention to it during the review of safety facility designs; therefore, all the cables in the tank area designed by us are currently buried underground

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.