HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Engineering Version] Daily Question 20171224

2017-12-24View Original

Thread Content

The construction organization design for a single project is prepared with that specific project as the focus. Under the guidance of the overall construction organization design, it is drafted by the unit responsible for carrying out the construction, based on (  ).   A. Construction plan B. Construction schedule C. Construction drawing design D. Construction arrangement Correct answer: C
Reply #22017-12-24
The construction organization design for a single project is prepared with that specific project as the focus; under the guidance of the overall construction organization design, it is drafted by the unit responsible for the actual construction based on ( c ).   A. Construction plan B. Construction schedule C. Construction drawing design D. Construction arrangement

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.