HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Means of controlling hazardous waste

2020-06-25View Original

Thread Content

I. Establish a standardized inventory system for hazardous waste; store such waste in categories and in designated areas. Install identification markers for hazardous waste during its collection, storage, transportation, and disposal. In particular, it is necessary to strengthen supervision and inspection of chemical industrial parks, chemical and hazardous material handling facilities, as well as hazardous waste disposal units within the jurisdiction.
Reply #22020-06-25
II. Implement a system for the declaration and registration of hazardous waste; strictly investigate and deal with related activities, while also incorporating them into credit management systems to enforce joint disciplinary actions; At the same time, a transfer document system for hazardous waste throughout all stages from generation to disposal should be established and improved; information technology should be utilized to control the flow of hazardous waste and to enable dynamic supervision ;
Reply #32020-06-25
III. Establish systems for inter-departmental coordination, regional cooperation, and joint oversight of major cases, in order to create a comprehensive supervision framework. Meanwhile, revise and improve the \"Standards for Pollution Control in the Storage of Hazardous Waste,\" and use strict measures and rigorous supervision to ensure that enterprises comply with relevant laws, regulations, and standards.
Reply #42020-06-25
IV. Accelerating the development of hazardous waste disposal capabilities is the final stage in dealing with hazardous waste, and it cannot be ignored either. In this regard, the Three-Year Action Plan calls for regions to reasonably plan the placement of waste disposal facilities, or for enterprises to handle the waste on their own, based on the types and quantities of hazardous waste generated in each area, in order to enhance regional capacity for hazardous waste disposal. At the same time, attention should be paid to hazardous waste of high risk levels, particularly by accelerating the development of advanced technical equipment for comprehensive waste disposal.
Reply #52020-06-25
How to transfer hazardous waste correctly? https://bbs.hcbbs.com/thread-3037010-1-1.html (Source: Huahai Chuanliu – Haichuan Chemical Industry Forum Website)
Reply #62020-06-26
The supervision, monitoring, and management of hazardous waste in the chemical industry are effective means of preventing pollution and controlling accidents. It is indeed necessary to carry out coordinated planning on a large scale: physical enterprises in various locations must comply with laws and regulations and proactively reduce emissions through technological improvements; meanwhile, storage and transportation networks need to be strictly monitored and precisely controlled in order to achieve tangible results

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.