HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

I’m a beginner building a partitioned tower for the first time, and everything shows as red. Here are the issues; please help, experts

2017-03-06View Original

Thread Content

This post was last edited by OCD Patient on 2017-3-6 at 12:55. After filling in all the required fields and clicking ‘Run’, two types of problems occur: 1) LIQUID FLOW ON STAGE 1 IS TENDING TO DISAPPEAR DUE TO LIQUID SIDEDRAW SPECIFICATION. 2) COLUMN DRIES UP. REVIEW SPECIFICATIONS OR PROVIDE BETTER INITIAL GUESSES. Moreover, the gas-liquid distribution on both the main and secondary trays is completely unreasonable; with only a few dozen kmol of feed, there is a liquid flow rate of over 3000. Below is the gas-liquid distribution for the main and secondary trays
Reply #22017-03-06
This post was last edited by OCD Patient on 2017-3-6 08:26: Incorrect partition wall tower

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.