HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pressure testing in a hermetically sealed tower

2017-12-21View Original

Thread Content

Which technician has newly installed equipment with full low voltage and argon? After installation, conduct a leak test. High and low voltage separated type. The main tower together with the argon tower. In addition to installing blind flanges at the inlet and outlet of the expander, blind flanges are also installed on the circulating argon pump. Do I need to add it at both the throttle valve leading to the tower and that leading to the crude argon condenser? Also, does it need to be added for nitrogen, oxygen, and contaminated nitrogen coming out of the tower? If anyone has experience with this, please share it
Reply #22017-12-22
All areas that need to be isolated should be equipped with~~ Airtightness tests should be conducted; if everything is fine, then it’s okay. If there are issues, the process must be repeated from scratch, and the problems must be resolved~~

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.