HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

When switching from a white-clay tower configuration to a single-tower operation, is it necessary to operate them in parallel first?

2018-03-28View Original

Thread Content

When switching from a white-clay tower configuration to a single-tower operation, is it necessary to operate them in parallel first?
Reply #22018-04-09
Whether it is to isolate the first tower or the second tower, it is necessary to first switch to parallel operation before isolating the tower; otherwise, it will lead to a disruption in discharge and pressure buildup.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.