HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

We have a 800,000-ton hydrogenation refining unit; during operation, the reflux tank at the top of the desulfurization tower often fills up. A new line was added to send naphtha to the tank farm, but since the tanks in that area are external floating-roof tanks equipped with breather valves, hydrogen sulfide gas spreads throughout the plant

2018-04-14View Original

Thread Content

Regarding the issue of the full level in the reflux tank at the desulfurization tower of the hydrorefining unit
Reply #22018-04-14
A full reflux tank indicates that the load at the top of the tower is too high. Could you reduce the amount of gasoline you use in blending? Also, when you mention the desulfurization tower, do you mean the hydrogen sulfide stripping tower or the fractionation tower?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.