HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Discussion on atmospheric tower operation

2018-10-01View Original

Thread Content

Take a look at the normal pressure column operation – is it performing well? Please give your advice
Reply #22018-10-01
In addition to looking at operational metrics, product metrics also need to be considered
Reply #32018-10-01
It is impossible to determine the quality of the operation based on your diagram; as long as the quality meets the requirements, the tower can operate continuously and stably.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.