A fault in the three-way valve of the hydro-coking desulfurization pump has resulted in insufficient preheating of the new tower, which affects the equipment. How should this be addressed?

2019-03-09View Original

Thread Content

The impact of the tower, new tower – how to handle operations of the old tower
Reply #22019-03-11
For the old tower, reduce the operating load; when using the new tower to introduce gas for heating, close the main valve on the oil and gas line a little more tightly, and so on. But we have one hour less for preheating here; the switch-over can still be carried out as usual

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.