Lifting of the 220-ton absorption tower for the ethylene glycol project in Binzhou along the Wei River

2019-08-21View Original

Thread Content

The 220-ton absorption tower for the purification unit of the ethylene glycol production project at Weihé Binzhou was lifted. Author/Source: Shaanxi Huajian Engineering Co., Ltd. Date: 2019-08-19. Clicks: 79. On August 13th, Shaanxi Huajian Equipment Lifting and Transportation Company successfully completed the lifting of the 220-ton absorption tower for the purification unit of Weihé Binzhou Chemical Co., Ltd.’s 300,000 tons per year coal-based ethylene glycol production project. The absorption tower has a diameter of 2 meters and a height of 61 meters. The 300,000 tons per year coal-based ethylene glycol project of Shaanxi Weihe Binzhou Chemical Co., Ltd. consists of thermal power units, gasification units, purification units, and ethylene glycol production units. There are a total of 84 large pieces of equipment in the project, and the lifting is carried out using the company’s 650-ton and 260-ton crawler cranes ; Since starting its lifting operations in October 2018, the lifting company has completed 70% of the equipment lifting tasks as of early August 2019; the lifting of large-scale equipment is scheduled to be finished by the end of September. The total investment for the 300,000-ton coal-based ethylene glycol production project is 5.495 billion yuan. The construction scope includes the main facilities such as gasification units, purification units, and ethylene glycol synthesis units, as well as auxiliary facilities for water supply and drainage, desalination stations, power supply, heating, and fire protection. It also encompasses storage and transportation systems, as well as environmental protection measures such as waste gas treatment, wastewater treatment, and solid waste disposal. Once completed, the project will be capable of producing 300,000 tons of ethylene glycol per year. The by-products include 17,576 tons of crude DMC per year, 5,336 tons of DMO reconstituted fractions per year, 5,920 tons of fusel oil per year, 13,440 tons of light fractions per year, 6,048 tons of heavy ethylene glycol fractions per year, and 4,321.6 tons of sulfur per year.
Reply #22019-08-21
Is this also high-tech chemistry?
Reply #32019-08-22
I see, thanks to the original poster for sharing

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.