Thread Content
On April 2, Sinopec Tahe Refining and Chemical Co., Ltd. released the first information disclosure on public participation in the environmental impact assessment of the Shunbei crude oil steam cracking million-ton ethylene project. According to the public announcement, the construction site of the main equipment of the project is located in Kuqa Economic and Technological Development Zone, Kuqa County, Xinjiang Uygur Autonomous Region, 8 kilometers east of the current Tahe Refining and Chemical plant area. Main construction content and scale: Build 10 sets of chemical plants led by 1 million tons/year ethylene, and the other 9 sets are 450,000 tons/year HDPE unit, 400,000 tons/year LLDPE unit, 200,000 tons/year LDPE unit, 200,000 tons/year1 #PP unit, 300,000 tons/year 2#PP unit, 140,000 tons/year butadiene extraction unit, 10/40,000 tons/year MTBE/butene-1 unit, 650,000 tons/year pyrolysis gasoline hydrogenation unit, and 350,000 tons/year aromatics extraction unit. In addition, supporting construction of boilers, circulating water fields, air separation and air pressure, power supply and distribution and other public projects ; Storage and transportation projects such as tank farms and loading and unloading stations ; Auxiliary production facilities such as warehouses and central laboratories ; Environmental protection facilities such as sewage treatment plants and hazardous waste temporary storage warehouses, and an elevated material transportation corridor between the existing Tahe Refinery site and the proposed site. Off-site projects include 220kV power supply project and special railway lines. Content source: Petrochemical hot spots