How to remedy settlement and tilting of pump foundations in chemical plants?

2017-02-06View Original

Thread Content

How to remedy settlement and tilting of pump foundations in chemical plants?
Reply #22017-02-07
First, identify the causes of settlement and tilting, and then take corrective action
Reply #32017-02-13
Agree with what was said above; it’s necessary to consider the condition of the soil layer and take appropriate measures, otherwise settlement will continue to occur. Methods include: pressurized grouting method, and pile installation under the foundation, etc.
Reply #42017-02-17
This post was last edited by zghzgh on 2017-2-17 08:42. Two options: First: tear it down and rebuild it; Second: If the foundation isn’t too large, it can be lifted as a whole; after the foundation is properly prepared, it can then be reinstalled. If the weight of the base is less than 3 to 5 times the weight of the pump, it needs to be redesigned
Reply #52017-02-20
Find the cause first, then determine the solution

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.