HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

There is a problem with the installation direction of the pump. The two pumps are usually installed side by side. Can they be installed end to end, or opposite to each other?

2020-04-08View Original

Thread Content

There is a problem with the installation direction of the pump. The two pumps are usually installed side by side. Can they be installed end to end, or opposite to each other?
Reply #22020-04-09
Or, according to the needs of the site, the design institute can design it.
Reply #32020-04-12
It depends on how your pipeline is connected.
Reply #42020-04-13
It can be connected end to end, but it depends on the on-site working conditions.
Reply #52020-04-13
Can. It mainly depends on your requirements.
Reply #62020-04-14
Yes, the key is that it does not affect the use and is convenient for layout.
Reply #72020-04-18
You can check what the on-site working conditions are like.
Reply #82020-04-28
Yes, but you must consider whether it is convenient for online inspection and maintenance

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.