HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How should the quench oil tower be adjusted in case of a failure in the quench oil pump?

2020-09-19View Original

Thread Content

As the title suggests! In an ethylene plant, what adjustments should be made to the quench oil tower when one of the two main quench oil circulation pumps fails, and the backup pump is also unable to start in such a situation? Thank you all for your guidance
Reply #22020-09-19
Although I don’t know much about the ethylene process, I wonder: since it’s such an important pump, why are there no corresponding protective measures in place? For example, is there a corresponding interlock?
Reply #32020-11-17
This question should be asked in the process technology community

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.