Thread Content
Pipelines or equipment are equipped with blind flanges, which are used for isolation during maintenance or purging. After completion, remove the blind flange as required by the process. During the commissioning or trial operation of chemical plants, poor management of blind flanges can lead to difficulties in starting up the plant, and in severe cases, it may even cause accidents. Therefore, the blind plate before driving is very important. Let’s all talk about blind plate management in driving.
It is indeed very important; in 2005, when we started working on one of our units, a pressure testing blind plate was omitted during disassembly. Although it didn’t cause any serious damage, it took a whole day to discover the issue.
Blind flanges should be manufactured in accordance with standards; the sealing surfaces must be fitted with water discharge lines, and the specifications and grades should be marked on the handles. They must not be installed arbitrarily.
I encountered a situation before where a pressure testing blind flange wasn’t removed during operation, and it took a long time to figure out the cause!
There are also many times when the pressure test bolts are not all tightened – only half of them are inserted, which is really scary
Do not rely too much on the sealing performance of valves; blind plates are very important
Blind plates are, to a certain extent, safer and more reliable than valves.
The plugs for blind plates should be managed with tags, and records should also be kept. The model, material, specifications, and responsible person of the blind plate must all be indicated on the plate.
The plugs for blind plates should be managed with tags, and records should also be kept. The model, material, specifications, and responsible person of the blind plate must all be indicated on the plate.
It’s much better to have blind plate management; before starting up, inspections still need to be carried out one by one according to the flowchart
It’s much better to have blind plate management; before starting up, inspections still need to be carried out one by one according to the flowchart