Thread Content
Modular construction for pipelines: Modular construction is a widely used construction method in international engineering projects today; it enables a significant increase in construction efficiency and reduces the space required at the construction site. The application of modular construction originated from patent holders who, in order to protect their intellectual property rights, developed sets of modular components that could be used on-site for construction, as a means to create technical barriers. The design and concept of modular engineering originate from offshore engineering and have been widely applied in the construction of ships and offshore platforms. @The wise are enlightened @StorageAndTransportEngineer @RedLee_ZZHI @leo_0088 @gn_1984 @LQ198619 @ylb913
Everyone is welcome to participate in the following series of sharing discussions; clicking on the link will take you there. -------------------------------------------------------------------------- This is a summary post for the 【Guess the Haichuan Equipment】 series – all Haichuan community members are encouraged to join in! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Industry Forum) Summary post for the 【Haichuan. Pioneers in the Chemical Industry】 series. https://bbs.hcbbs.com/thread-1842627-1-1.html (Source: Haichuan Chemical Industry Forum) Everyone is welcome to support the activities in the leisure section; just click on the link below to access it. There’s also a link to Haichuan Leisure Section – Food and Tourism Edition, which offers online travel experiences for the National Day holiday. Rules for the first “Love Haichuan, Love Photography” competition in the chemical industry. Summary post for the discussions on modular installation in Haichuan; everyone is welcome to participate in these discussions! https://bbs.hcbbs.com/thread-1773168-1-1.html (Source: Haichuan Chemical Industry Forum Website)
The traditional construction approach involves carrying out all construction tasks at the site of the project. This method results in long construction times, requires significant investment in human and material resources, involves numerous overlapping tasks, and necessitates the construction of many temporary facilities, thus having a considerable impact on the environment surrounding the plant site. Modular welding installation for projects: Project modularization refers to the division of an entire project into multiple modules for manufacturing, based on the factory’s production capabilities and functional requirements. The manufacturing of these modules can take place in one location or in different locations; after being pre-assembled, they are transported via large ships to the site of the project where they are installed and tested. Modularization usually results in costs that are 10%-15% higher than those of building directly at the project site, but it improves the quality of the construction, reduces the construction time, and lowers labor costs, thereby reducing the overall cost of installing the facility. With the continuous improvement in equipment manufacturing capabilities and lifting strength, modular construction is being widely used in special areas and projects. In the future, there will be a continuous decline in the number of welders and plumbers on construction sites; instead, most of these workers will be employed in factories for prefabrication and installation, with over 90% of the work on each module being completed inside the factory. For modular construction in factory settings, since the welding positions are relatively simple yet high precision is required regarding dimensions, higher skills are demanded of welders and pipe fitters.
For transportation, SPMTs (Self-Propelled Modular Transporters) are used. These vehicles are controlled by computers and represent a high-tech product developed on the basis of hydraulic trailers; their wheels are hydraulically driven, allowing for independent steering and height adjustment. There are various steering modes available, and the overall vehicle is highly flexible, enabling the smooth transport of extremely heavy loads even on complex road conditions.
I see that for this set of modules, aside from the cracking module of the ethylene plant on the first floor which is from China and supplied by Huisheng Engineering, the other process and pipeline modules are all manufactured abroad. It is evident that there is still a significant gap between China’s approach to modularity and that of foreign countries, and efforts are needed to catch up.
The core of modularity also lies in “module design”.