HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Chifeng Tianji’s 5 billion yuan investment in the Songshan District integrated wind and solar hydrogen production project (the hydrogen and alcohol production section)

2026-04-15View Original

Thread Content

Project Name: Chifeng Tianji Songshan District Integrated Wind and Solar Hydrogen Production Project (Hydrogen and Alcohol Production Section)
Launch Date: April 14, 2026
Region: Inner Mongolia
Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Raw Materials and Chemical Products/Chemical Raw Materials; New infrastructure and new industries / New industries / Hydrogen energy. Project owner: Chifeng Tianji New Energy Co., Ltd. Total investment amount: 500 million yuan. Current progress: The project has been registered. Location of construction: Northwest of the intersection of Street 5 and Road 6 in Anqing Industrial Park, Songshan District, Chifeng City, Inner Mongolia Autonomous Region. Scope of construction: The project covers an area of approximately 1,150 mu; it will include 100 electrolyzers with a hydrogen production capacity of 1,000 Nm3/h, as well as 40 hydrogen storage tanks with a capacity of 2,000 m3 each. The annual hydrogen production capacity will be 40,500 tons. Additionally, a production line for 500,000 tons of methanol per year along with related facilities will be built. Progress milestone: 2026-04-13. The project registration was approved and completed in January 2026. (Project registration)
Reply #22026-04-15
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Choosing the Sampling Point for Pressure Gauges Below Horizontal Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-04-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】3083-2026: SHENGU manufactures China’s first single-stage cantilevered fully assembled centrifugal compressor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717804 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-04-16
【Ten Years of Rapid Development in Chemical Equipment】Successful one-time commissioning of the world’s first ethylene glycol production process from light hydrocarbons in Lianyungang from 2030 to 2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #52026-04-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】3074-2026: Filling a gap in China’s market; pilot production successful for catalysts with an extremely low water-carbon ratio https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717537 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-04-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】3074-2026: Filling a gap in China’s market; pilot production successful for catalysts with an extremely low water-carbon ratio https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717537 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-04-18
【Ten Years of Rapid Development in Chemical Engineering Equipment】The Haiwang Hydrogen Energy Ningdong Organic Liquid Hydrogen Storage Materials Facility began trial production in 203088–2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718001 (Source: Huchuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #82026-04-18
【Haichuan Equipment Guessing Game】What is tied to the pipe? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718037 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-04-19
【Hechuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #102026-04-19
【Hechuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #112026-04-21
【Ten Years of Rapid Development in Chemical Processing Equipment】3088-2026: China’s first demonstration project for producing high-quality synthetic crude oil using green hydrogen in combination with low-quality heavy oil has been launched. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718140 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.