Thread Content
On August 26, good news came from the aromatics plant of Liaoyang Petrochemical Company: The 705,000 tons/year paraxylene unit of the aromatic hydrocarbons joint workshop successfully completed the calibration work. The unit load was stable at 100%, the product output reached 84.04 tons/hour, and the product purity and yield reached 99.88% and 98.5% respectively, marking that the aromatic hydrocarbons efficiency improvement project successfully reached production standards. Since the beginning of this year, Liaoyang Petrochemical Company, taking into account the characteristics of Russian oil that is rich in aromatics, has taken strengthening and expanding the aromatics industry as a strategic direction, and has made a decisive layout around "reducing oil and increasing chemicals": The aromatics efficiency enhancement project will increase the annual production capacity of the unit by 255,000 tons, and the total paraxylene production capacity will reach 985,000 tons/year. The aromatics efficiency improvement project with a total investment of 232.24 million yuan includes replacing 180 layers of high-efficiency trays in the raffinate liquid tower, extracted liquid tower, and finished product tower, replacing 26 layers of grids and 24 layers of new adsorbent in the adsorption tower, replacing new catalysts in the isomerization reactor, adding 5 new heat exchangers, renovating 4 heat exchangers, updating 2 containers, replacing 20 process pumps, etc. At the same time, adaptive transformation of the public engineering system is carried out to coordinate with the process transformation. On August 6, as the device successfully produced qualified products after the first start-up, the aromatics plant and workshop organized load increase in an orderly manner. At present, the paraxylene plant has entered a steady state, and the workshop urges employees to carefully monitor and conduct inspections to ensure long-term optimized operation of the plant. (Gao Shu newspaper reporter Yan Peixin)
On August 13, good news came from PetroChina Liaoyang Petrochemical Company: After shutting down for major maintenance, the gas separation unit of Liaoyang Petrochemical's Rosneft Project produced the first tank of high-grade propylene with a moisture content of ≤20 ppm. The production of the unit returned to the "high-grade era" and continued the "miracle" of producing high-grade propylene without any dehydration facilities. Since the beginning of this year, Liaoyang Petrochemical Company has focused on the strategic needs of the group company, made precise efforts, adhered to the "two-wheel drive" of scientific and technological innovation and institutional innovation, promoted dual-sequence reforms in the field of scientific research, increased rewards for scientific research development and application, improved the scientific research competition incentive mechanism and the scientific research results transformation mechanism, formulated supporting reward methods for PETG copolyester and ultra-high molecular weight polyethylene, and promoted the development of characteristic new products to achieve breakthroughs and achieve economic results as soon as possible. Currently, Liaoyang Petrochemical Company is promoting comprehensive innovation with scientific and technological innovation as the core, realizing the transformation from investment-driven development to innovation-driven development. The company further improves the chemical industry layout, intensively optimizes the refining and chemical business, gives full play to the advantages of integration, and transforms and upgrades from a "fuel type" in oil refining to a "material type" in chemical industry. The company also promotes safe development and green development, and its scientific and technological contribution rate and total factor productivity continue to increase. (Wang Zhiqiang, reporter Yan Peixin)
Liaohua, since its small ethylene transformation began more than ten years ago, has been making small steps. This aromatic reform is a big step forward.
Opportunities still lie in the Goose Oil Liaoyang Petrochemical Company, which combines the characteristics of Russian oil with rich aromatic hydrocarbons, takes strengthening and expanding the aromatic hydrocarbons industry as a strategic direction, and decisively deploys around "reducing oil and increasing chemicals": The aromatics efficiency enhancement project will increase the annual production capacity of the unit by 255,000 tons, and the total paraxylene production capacity will reach 985,000 tons/year.
July 10, 2 pm: 00, the renovation of the F110 cracking furnace of the 200,000 tons/year ethylene cracking unit of the Liaoyang Petrochemical Olefin Plant undertaken by the Liaoyang Project Department was successfully handed over. So far, the three-year civil engineering and installation project of the 200,000 tons/year ethylene cracking unit renovation has been completed. Since 2004, the company has not undertaken the construction of an ethylene cracking unit for more than ten years. In order to increase new performance, the project department actively communicated with the owner and the general contractor in early 2017 and successfully won the bid for the civil construction and installation project of the 200,000 tons/year ethylene cracking unit through fierce competition. This project is an important sub-project of Liaoyang Petrochemical's Russian crude oil processing optimization and efficiency improvement project. Construction started on May 25, 2017. Since then, it has completed the transformation of three cracking furnaces including F103X/F102X/F101X and successfully put them into operation safely and safely. It has played a positive role in helping Liaoyang Petrochemical Company proactively adjust and optimize its product structure, actively adapt to market demand, turn losses into profits, and achieve its third entrepreneurship. During the implementation of the project, a group of talents who are familiar with the construction technology and management of ethylene cracking units have been trained and tempered, and a large amount of experience in construction organization and management has been accumulated, which has reserved strength for the company to build ethylene units in the future.
From May 23rd to 24th, the "2019 China Chemical Park and Industrial Development Forum" was successfully held in Huizhou, Guangdong. At the media meeting and park investment matching meeting held at the same time as the forum, Cui Anyong, director of the Management Committee of Liaoyang High-tech Industrial Development Zone in Liaoning Province, gave a report and gave a detailed introduction to the development status, strategic planning and investment opportunities of Liaoyang High-tech Zone. Liaoyang High-tech Zone was established in 1978 with the * * The new urban area developed from the construction of the very large enterprise PetroChina Liaoyang Petrochemical Fiber Company, enjoys the reputation of "Northern Chemical Fiber City", with a planned area of 30 square kilometers, and is an important part of the high-tech industrial development belt of the Liaodong Peninsula. Liaoyang High-tech Zone was established in May 1992. In February 1999, the High-tech Zone and Hongwei District of Liaoyang City jointly operated. In 2007, it was approved to build the aromatic hydrocarbons and fine chemical industry base of Liaoning Province. In January 2010, * * recognized by the Ministry of Science and Technology as * * Aromatics and fine chemicals high-tech industrialization base, upgraded to * * level high-tech industrial zone. An important carrier for Liaoyang High-tech Zone to build a 100-billion-yuan industrial base is the aromatics base. The base has a planned area of 20 square kilometers. Liaoyang Petrochemical Company is the leader and has 34 petrochemical and fine chemical companies stationed there. It can provide 20 kinds of petrochemical raw materials with nearly 3 million tons of petrochemical raw materials and produce more than 200 kinds of petrochemical and fine chemical products. Currently, Liaoyang Petrochemical has a refining capacity of 10 million tons, and is transforming and upgrading to an integrated refining and chemical industry. This year and next, it will implement projects such as 300,000 tons/year polypropylene, aromatics efficiency improvement and phthalate production increase. It is planning projects such as the expansion and expansion of an annual output of 1 million tons of ethylene and the expansion and transformation of an annual aromatic production of 1 million tons. These projects mainly come from 5 industrial chains. One is the ethylene industry chain. This chain includes polyethylene, ethylene oxide and other products, which are mainly used in pipes, films, surfactants and other industries to produce water reducing agents and downstream products. The second is the propylene industry chain. This chain includes products such as polypropylene and propylene oxide, which are mainly used in the automotive and packaging industries to produce polyether polyols and downstream products. The third is the aromatics industry chain. This chain includes benzene, paraxylene, o-xylene and other products, which are mainly used in construction, textile, plastics and other industries. The fourth is the carbon four industry chain. This chain mainly contains butadiene, which is used to produce styrene-butadiene rubber, butadiene rubber and other products, and is widely used in the automobile tire industry. The fifth is the carbon five and carbon nine industrial chain. It mainly produces products such as isoprene, dicyclopentadiene and petroleum resin, which are used in rubber, paint and other industries. Currently, Liaoyang High-tech Zone is promoting seven investment projects in the aromatics and fine chemical industries. 1. 3 million tons/year purified terephthalic acid (PTA) project. This project covers an area of 800 acres, with a total investment of 8.464 billion yuan and a total annual profit and tax of 1.013 billion yuan. 2. 100,000 tons/year special polypropylene modified engineering plastics and 20,000 tons/year polypropylene thermoplastic elastomer projects. The project covers an area of 110 acres, with a total investment of 784 million yuan and a total annual profit and tax of 131 million yuan. 3. 100,000 tons/year phthalic anhydride and 100,000 tons/year plastic plasticizer projects. The project covers an area of 150 acres, with a total investment of 1.295 billion yuan and a total annual profit and tax of 137 million yuan. 4. 50,000 tons/year high-performance polyester film project. The project covers an area of 120 acres, with a total investment of 500 million yuan and a total annual profit and tax of 160 million yuan. 5. 500,000 tons/year polystyrene project. The project covers an area of 50 acres, with a total investment of 150 million yuan and a total annual profit and tax of 53 million yuan. 6. The 100,000 tons/year solution polymerized styrene-butadiene rubber project covers an area of 200 acres, with a total investment of 670 million yuan and a profit and tax of 127 million yuan. 7. Ethylene cracking carbon 5 and carbon 9 deep processing project. The project covers an area of 100 acres, with a total investment of 1.035 billion yuan and a total annual profit and tax of 331 million yuan.
The total investment is 5.265 billion yuan! Liaoyang Petrochemical's Russian oil processing optimization and efficiency improvement project has started, and it is planned to be fully completed in August 2018. Petrochemical Forum 2016-10-13 On October 12, PetroChina Liaoyang Petrochemical Company held a mobilization meeting, and the much-watched Russian crude oil processing optimization and efficiency improvement project officially started. Two years later, with the installation and operation of a series of large-scale units of the Russian oil processing optimization and efficiency improvement project with a total investment of 5.265 billion yuan, Liaoyang Petrochemical will significantly improve its crude oil processing efficiency and embark on the road of optimization and efficiency improvement relying on Russian oil resources, highlighting the aromatics industry, promoting industrial upgrading, and building China's large petrochemical base. Liaoyang Petrochemical is currently the only fully hydrogenated refinery in China that processes Russian crude oil. It has supporting processing capabilities of tens of millions of tons of Russian crude oil, and its production capacity of aromatics and derivatives ranks among the top in the country. However, due to the limitations of processing technology, it is difficult to achieve optimized and efficient processing of Russian oil. In particular, the advantages of Russian oil as a high-quality aromatic hydrocarbon raw material have not been fully exerted, and there has been a situation of "high-end and low-end" and "fine grains have not produced high-quality products." Since 2012, Liaoyang Petrochemical has decisively adjusted its development strategy. After three years, it finally completed the "Liaoyang Petrochemical Russian Crude Oil Processing Optimization and Efficiency Improvement Plan". This program got * * , the province and Liaoyang City attach great importance and support, and were included in the * * The development layout of the petrochemical industry and the overall layout of "two construction and one reform" of China's petroleum refining and chemical business have been incorporated into the State Council's "Opinions on Several Major Policy Initiatives to Support the Revitalization of Northeast China in the Recent Period". This project has become a key project for accelerating revitalization and development and promoting the construction of the “One Belt, One Road” during the “Thirteenth Five-Year Plan” period of our province, and has become the leading project in Liaoyang City’s comprehensive construction of an aromatics and fine chemical industry base with an output value of over 100 billion yuan. Liaohua's Russian crude oil processing optimization and efficiency improvement project has a total investment of 5.265 billion yuan. Its core content is to build 11 new units with an annual capacity of 2.4 million tons of residual oil hydrogenation and 2.2 million tons of heavy oil catalytic cracking on the basis of the unchanged annual processing capacity of Russian oil. It will also transform 5 units including wax oil hydrocracking, ethylene cracking and sulfur recovery. Through new construction and renovation, this project not only realizes the optimization and improvement of the oil refining and aromatics industry chain, but also revitalizes existing chemical production equipment and matches new and old equipment, thereby maximizing the potential for profit creation and better utilizing the advantages of refining and chemical integration. After the project is officially put into operation, it can reduce petroleum coke by 300,000 tons, produce 2.6 million tons of gasoline and 3.3 million tons of diesel, and the diesel-gasoline ratio reaches 1.27. The diesel-gasoline ratio can be reduced to 1.06 by increasing the production of aviation kerosene. Technical and economic indicators and energy consumption indicators will be further optimized and improved. At the same time, the project has also increased the production of aromatic hydrocarbon products and optimized ethylene raw materials. It can increase profits by 2.1 billion yuan per year and has considerable economic benefits. According to the overall implementation schedule of the project, the civil engineering project will begin full construction in November this year, and equipment installation will begin in May next year. The project will be fully handed over by August 30, 2018, and will officially undertake the on-time transportation and processing tasks of Russian crude oil that year.
[Guess what Haichuan Equipment has] Stable operation, low noise, and cute Peter Pan look https://bbs.hcbbs.com/thread-2779338-1-1.html (Source: Haichuan Chemical Forum Network)
Only the renovation of three cracking furnaces increased ethylene production by 200,000 tons? Regardless of the size of the furnace, the current capacity of a single furnace is 200,000 tons.