HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is a PHU device?

2019-09-04View Original

Thread Content

It is now popular to use English abbreviations
Reply #22019-09-04
Different industries have different names for PHU. The packaging unit is built by Shanghai Engineering Company. KPI of Kazakhstan The IPCI (Petrochemical Integration of Petrochemical Industry Corporation) project has completed 80% of the workload, of which 82% of the design has been completed, 191 standard specifications have been completed (204 in total), PDH (propane dehydrogenation), PP (polypropylene), PHU (packaging unit) devices Hazop (hazard and operability analysis) and 30% model review of utility works have been completed, procurement has been completed 40%, 193 MR (requisition documents) completed (207 in total), construction site temporary installation, construction camp, large lifting instructions and construction feasibility study completed. The KPI IPCI project is the first large-scale petrochemical integration project in Kazakhstan and one of the important milestone projects in the economic cooperation between China and Kazakhstan. The project type is engineering, procurement, construction, start-up (EPCC) general contracting. The project content includes a 500,000 tons/year propane dehydrogenation unit (PDH) and a 500,000 tons/year polypropylene unit (PP), as well as public engineering facilities and supporting infrastructure outside the plant for the two sets of process units. The project is implemented in two phases: The first stage is the transparent estimation stage (referred to as: OBE stage), which is equivalent to the domestic basic design stage and carries out project basic design and cost estimation.* * Submission for approval, as well as the planning of the general contracting implementation stage of the project, the cycle is 12 months. The second stage is the general contracting stage (referred to as: LSTK stage), which is based on the planning documents of the basic design and OBE stages, and is based on the Kazakhstan * * Based on the approval opinions of the project, we will carry out the general contracting implementation work and complete the corresponding design, procurement, construction, start-up and device performance assessment. The general contracting construction period is 40 months. Shanghai Engineering Company has set foot in Kazakhstan for the first time. The total contract value of the country's KPI IPCI project is approximately 1.624 billion US dollars. It is the largest overseas project undertaken by Shanghai Engineering Company recently. The Kazakhstan KPI IPCI project is higher than domestic regulations in terms of parameter values, system setting requirements, and equipment and material selection regulations.
Reply #32019-09-04
Shanghai Engineering Company, is it Sinopec Shanghai Engineering Company, or which company?
Reply #42019-09-04
I don’t know, the reply was in 2012.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.