HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Haichuan Chemical Salary News] Yushen Energy of Yanjiang Petroleum to invest 7 billion yuan in a coal chemical project; EPC bidding to take place this month

2020-04-12View Original

Thread Content

Recently, the dynamic compaction work for Shaanxi Yanchang Petroleum Yushen Energy Chemical Co., Ltd.’s 500,000 tons per year coal-based ethanol project has been fully completed, and detailed survey work is currently in progress; The manufacturers for 15 long-cycle equipment units, including air separation units, gasifiers, and reactors in ethanol production facilities, have been identified, and the EPC bidding will take place in April. ? Economic Herald, 8 hours ago? · Official account of Economic Herald; Reporters: Chu Lei. The Dongjiakou Port–Weifang–Central and Northern Shandong oil pipeline project (Phase 3, southern route) has recently been approved by the Shandong Provincial Development and Reform Commission. This project is a key initiative for the transformation of old and new economic drivers in Shandong Province. Phase 3 (the southern route) starts at the Kelida distribution station of the Dongwei oil pipeline and ends at the Jincheng Petrochemical terminal, with a total length of approximately 98.1 kilometers. The estimated total investment exceeds 610 million yuan, and the designed annual transportation capacity is 10 million tons. In January of this year, Phase 3 of this project was put into operation, linking the 65 oil product berths and tank farms with a capacity of over 50 million cubic meters at Shandong Port to the cluster of local refining enterprises in Shandong, thus creating a network of \"large ports, large tank areas, and extensive pipelines\" that covers Shandong and extends into Jiangsu and Henan.
Reply #22020-04-12
It is reported that in 2020, Yushen Company will make every effort to advance the construction of the ethanol project by focusing on three \"completions\", two \"50% targets\" and one \"start“. The three \"completions\" refer to completing the annual investment of 1.18 billion yuan in the project, finalizing the EPC contract for the ethanol project, and completing the procurement of long-term-use equipment; The two “50%” refer to completing 50% of the detailed design and 50% of the civil construction work ; A “Start” means beginning the device installation.
Reply #32020-04-12
Guess which engineering companies will win the bid to carry out the construction of this project
Reply #42020-04-12
The 500,000 tons per year coal-based ethanol project of Shaanxi Yanchang Petroleum Yushen Energy Chemical Co., Ltd. has a total investment of 6.98 billion yuan and covers an area of 1,365 mu. It utilizes Yanchang Petroleum’s own dimethyl ether carbonylation technology to produce ethanol at a rate of 500,000 tons per year; the project is scheduled to be completed by the end of 2021.
Reply #52020-04-12
Shaanxi Yanchang Petroleum Yushen Energy Chemical Co., Ltd.’s 500,000 tons/year coal-based ethanol project. Project type: new construction; Construction unit: Shaanxi Yanchang Petroleum Yushen Energy Chemical Co., Ltd ; Construction location: South Area of Qingshui Industrial Park, Yushen Industrial Zone, Yulin City, Shaanxi Province ; Staffing and operation system: The project requires 674 employees, and continuous operation is employed; the workers work on a four-shift, three-cycle system, with 8,000 hours of work per year ; Construction contents: Construction of gasification, shift, purification, gas separation, methanol synthesis, and 500,000 t/a ethanol production facilities (dimethyl ether, methyl acetate, and ethanol units), a 7,500 Nm3/h air separation unit, 3 × 220 t/h high-pressure coal powder boilers, a 6,000 t/a sulfur production facility, along with associated utility systems ; The project uses the Xiywan open-pit coal mine as its raw material, and employs the HT-L gasification technology to produce raw gas. One stream of this raw gas undergoes conversion, while another stream is used for waste heat recovery. Both streams are then subjected to low-temperature methanol washing to remove sulfur and carbon dioxide from them. The gas that has not undergone conversion is purified and separated into H2 and CO through deep cooling; part of the gas that has undergone conversion is sent to a PSA unit for hydrogen production, and another part is sent to a methanol synthesis plant to produce methanol. CO, H2, and methanol are then sent to an ethanol production facility.
Reply #62020-04-12
If nothing goes wrong, it will still be Hualu.
Reply #72020-04-13
From September 4 to 5, 2019, Yushen Energy & Chemical Company of Shaanxi Yanchang Petroleum entrusted China Aerospace Changzheng Chemical Engineering Co., Ltd. to hold a review meeting for the gasification process package in Beijing. Five experts were specially invited to attend the meeting: Cheng Dongzhao, chief engineer at Puyang Longyu Chemical; Ren Shan, director of Jinmei Zhongneng Gasification; and senior engineers Zhou Jinglin, Ren Chao, and Jia Wei from Hualu. Representatives from various professional teams of the aerospace company as well as those from the Xi’an branch of Beijing Engineering Co., Ltd. also participated in the meeting. During the review meeting, the expert group and participants listened carefully to the comprehensive presentation provided by Aerospace Changzheng Company on the \"Aerospace Powder Gasification Process Package for the Yushen 500,000 tons/year Ethanol Project.\" They examined the contents of each volume in detail, asked questions regarding the design concepts, technical approaches, and relevant standard documents. They held discussions in groups, offered valuable suggestions from the perspectives of process, equipment, and instrumentation, and reached a consensus. The aerospace company commits to making the necessary revisions and improvements to the process package in accordance with the expert group’s recommendations, and to delivering the final version of the process package on time as required by the contract. The successful conclusion of this review meeting for the gasification process package marks a crucial step forward in the construction of the gasification unit at Shaanxi Yanchang Petroleum Yushen Energy Chemical Company, laying a solid foundation for the project’s development. On September 4, the technical evaluation meeting for the environmental impact assessment report of the 500,000 tons per year coal-based ethanol project was successfully held in Xi’an, and the environmental impact assessment report passed the expert review. This meeting was hosted by the Shaanxi Provincial Environmental Investigation and Assessment Center. Participants included the Shaanxi Provincial Department of Ecology and Environment, the Yulin Municipal Bureau of Ecology and Environment, Beijing Petrochemical Engineering Co., Ltd., as well as the company’s general manager Guo Zunli and deputy general manager Kang Xiaoxu. The conference invited 5 experts to conduct a technical assessment of the environmental impact assessment report. At the meeting, President Guo first introduced the project overview and the progress of preliminary work to the attending leaders and experts. The report preparer presented to the meeting information on the overview of the construction project, the current environmental conditions in the area surrounding the construction site, predictions and evaluations of environmental impacts during the construction and operation phases, environmental protection measures along with assessments of their technical and economic feasibility, as well as plans for environmental management and monitoring. The experts present gave high praise to the construction of this project, and at the same time offered constructive suggestions and recommendations. Following technical consultations and thorough discussions, it was unanimously agreed that the project meets the requirements of **industrial policies and relevant plans. By implementing the various pollution prevention and control measures as well as ecological restoration measures outlined in the implementation report, the adverse environmental impacts can be mitigated; from an environmental impact perspective, the construction of this project is feasible. Shaanxi Yanchang Petroleum Yushen Energy Chemical Co., Ltd.’s 500,000 tons per year coal-based ethanol project is planned to be built in the Qingshui Industrial Park of the Yushen Industrial Zone. The main construction scope and details include: using Xiwan coal as raw material to build a new 450,000 tons per year methanol production complex (comprising coal gasification, purification, shift reaction, gas separation, and methanol production units), a 500,000 tons per year ethanol production complex (including dimethyl ether, methyl acetate, and ethanol production units), an air separation unit with a capacity of 75,000 Nm3/h, 3 × 220 tons per hour high-pressure coal powder boilers, a 6,000 tons per year sulfur production facility, along with the necessary supporting utilities.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.