Tender for Miscellaneous Engineering Design and Technical Services by China Coal Ordos Energy Chemical Co., Ltd. According to the China Electric Power Bidding Network (www.dlzb.com), a tender is currently underway for miscellaneous engineering design and technical services by China Coal Ordos Energy Chemical Co., Ltd. For more details, please see below: Project Overview and Scope of the Tender 1. Project Overview and Scope of the Tender: 1.1 Project Overview: The project of China Coal Ordos Energy Chemical Co., Ltd., which aims to produce 2 million tons of synthetic ammonia and 3.5 million tons of urea per year, is being carried out in two phases. The first phase, which involves the production of 1 million tons of synthetic ammonia and 1.75 million tons of urea per year, came online in February 2014. Based on the current market and operational conditions, Phase II of the project has been modified to produce 1 million tons per year of methanol from syngas, thereby supplying MTO-grade methanol feedstock to the olefin plants of China Coal Mengda Company. Phase 2 is currently under construction, with commissioning expected in April 2021. To keep up with **safety, environmental protection, and chemical industry policies and to further optimize production and living systems, it is necessary to carry out timely partial upgrades and modifications to existing production facilities and living systems. The tenderer plans to select an engineering design and technical services firm through an open tender process in the domestic market, to be responsible for the design and technical services related to technical upgrades and minor projects carried out during the company’s project construction and production operations.
1.2 Scope of the tender: Technical upgrades, miscellaneous engineering design tasks, and technical services related to the production facilities under the jurisdiction of China Coal Ordos Energy Chemical Co., Ltd. (including mainly: water supply and drainage systems, boiler systems, air separation units, gasification units, low-temperature methanol washing units, liquid nitrogen washing units, CO cryogenic separation units, ammonia synthesis units, methanol synthesis units, urea production units, liquefied methane units, comprehensive tank areas, methanol transmission pipelines, etc.), as well as the areas in front of the factory and living areas. It also includes emergency and temporary consulting, design, and technical service activities. The work scope includes engineering design (feasibility study reports, preliminary design, construction drawings), consulting, technical services (updating PFDPID diagrams for existing installations, updating the overall plant layout plans and water supply and drainage network plans), on-site services, and preparation of as-built drawings. Technical services involve attending various meetings and technical negotiations, preparing technical documents, and providing technical briefings.
2. Source of funds: Funded by the enterprise itself. 3. Service period: From the date of contract signing until June 30, 2022. 4. Location of service: China Coal Ordos Energy Chemical Co., Ltd., Tuk Industrial Park, Wushen Banner, Ordos, Inner Mongolia. Application deadline: April 13, 2020, to 17:00 on April 23, 2020; deadline for paying the bid documents: April 13, 2020, to 17:00 on April 30, 2020
This is why CNPC and Sinopec have so many facilities – each plant is accompanied by a design institute that is responsible for the overall layout of the plant, technical upgrades and improvements, as well as the design of minor projects. China Coal is located in Tuk, and there are no chemical engineering design institutes within hundreds of kilometers in the vicinity; transportation is very inconvenient. Providing on-site service requires at least 2 days for each round trip, resulting in high costs.