Thread Content
On May 15, the newly built 100,000-ton/year sulfur recovery unit at Luoyang Petrochemical was successfully handed over. This unit is the first production facility to be completed as part of Luoyang Petrochemical’s refinery restructuring project.
The facility utilizes Sinopec’s own technology; the project construction is managed by Luoyang Petrochemical, while Luoyang Petrochemical Engineering Design Co., Ltd. is responsible for the design work. In addition, the installation project contractor is Luoyang Longhui Petrochemical Engineering Co., Ltd., the construction contractor is Luoyang Refining and Chemical Engineering Co., Ltd., and supervision is carried out by Luoyang Petrochemical Engineering Construction Group Co., Ltd. It is reported that the oil refining structure adjustment project, with a total investment of 4.5 billion yuan, was approved for construction in July 2017. After more than a year of preparation work, civil engineering construction began on January 11, 2019, and installation work started on July 19, 2019. The sulfur recovery unit was the first of the 5 newly built units to reach completion. The other 4 units, namely the 2.6 million tons per year residue hydrogenation unit, the 1.2 million tons per year continuous reforming unit, the 450,000 tons per year aromatic extraction unit, and the 80,000 cubic meters per hour hydrogen concentration unit, have entered the final stages of construction and are expected to be completed by the end of May.
Sinopec’s own technology....? Which company’s? Previously, three-dimensional technology, Zhenhai Engineering Company, and Jinling Institute’s sulfur recovery technology were used.
LEPC does indeed have its own sulfur recovery technology, but...
Haven’t I heard that the Luoyang plant has its own sulfur recovery technology? Where is it used?
There really are, I just checked again! I can’t say exactly where it’s inconvenient.......
The project construction is managed by Luoyang Petrochemical, with Luoyang Petrochemical Engineering Design Co., Ltd. undertaking the design work. In addition, the installation project contractor is Luoyang Longhui Petrochemical Engineering Co., Ltd., the construction contractor is Luoyang Refining and Chemical Engineering Co., Ltd., and supervision is carried out by Luoyang Petrochemical Engineering Construction Group Co., Ltd.
Sinopec is not the same as Nopack, you know