According to Fuding News Network (Wang Tingting), the Fujian Huidé New Materials project has been in a intensive testing phase these past days, with trial operation expected to begin in mid-June. It is understood that the Fujian Huidé New Materials project is located in the Long’an Industrial Park, with a planned land area of 71,530.2 square meters and a total construction area of 40,033 square meters. The total investment in this project is approximately 450 million yuan. The main products are new materials, including polyurethane resins for synthetic leather (with an annual designed production capacity of 100,000 tons), TPU elastomers (with an annual designed production capacity of 50,000 tons), polyurethane compounds and modified materials (with an annual designed production capacity of 20,000 tons), and water-based polyurethane resins (with an annual designed production capacity of 10,000 tons). The main construction components include production workshops, storage and transportation facilities, utility systems (water supply, power supply, circulating water system, refrigeration system, heating system), and environmental protection facilities.
To date, the civil construction and interior decoration for various facilities of this project have been largely completed, including production buildings, workshops, tank areas, Class A warehouses, Class C warehouses, power stations, biochemical accident containment tanks, storage areas, and office buildings; The installation of the main equipment is essentially complete, and it has entered the debugging phase. Once the project is put into operation, it will leverage its advantages in technology, talent, capital, supply chain, sales channels, and EHS management to accelerate the production of environmentally friendly, high-performance, high-quality, and low-cost products that meet the needs of upstream industries. It will also play a role in driving the transformation and upgrading of the synthetic leather industry within the Long’an Industrial Park, contributing to the healthy and sustainable development of Long’an China Ecological Synthetic Leather Industrial Park.
It’s expected to start trial operation in mid-June, even though it’s only just basically completed? It seems that the scale of the installation is not large and the process is not long. I wouldn’t dare make such bold claims when it comes to home renovations. The chemical plant has been basically completed – trial operation to begin in 20 days; safety and stability come first! b]
The investment is not large; it mainly relates to resin synthesis. Moreover, the names of these products are often confusing – these days, any project can be labeled as a new material