Construction of the central control building for Phase 1 of the second phase of Yulin Chemical Project under Shaanxi Coal Group begins

2025-12-10View Original

Thread Content

Recently, the groundbreaking ceremony for the Central Control Building of Phase I of the Second Phase of Yulin Chemical Project under Shaanxi Coal and Chemical Industry Group was held. The project is general-contracted by China Chemical Engineering Donghua Company, marking that the construction of the Central Control Building has now fully entered the general contracting implementation phase. Representatives from the Yulin Chemical and Electrical Instrumentation Department of Shaanxi Coal Group, the supervision unit, the general contractor, and other parties involved in the project attended the ceremony. The central control building is the largest control room project that Donghua Company has undertaken to date under the EPC turnkey contract model. It has a total construction area of approximately 11,953.85 square meters and a land area of about 7,644.83 square meters; both its scale and functional requirements are at the leading level in the industry. The building integrates advanced automation control systems, production information systems, as well as telecommunications, electrical, HVAC, and fresh air systems. By enabling real-time collection, monitoring, control, and analysis of production data, it ensures the efficient operation of all equipment. At the same time, the central control building serves as the hub for the project’s production operations, maintenance coordination, and emergency command; it enables rapid activation of emergency response plans in urgent situations, thereby effectively ensuring the safety of personnel and property.
Reply #22025-12-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】100 Days of Safe Operation for CNPC Gansu Company’s Natural Gas Hydrogen Blending Pilot Project: A Major Milestone Towards Commercial Operation https://bbs.hcbbs.com/thread-5706934-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-11
This month, a building is being constructed in northern Shaanxi; there’s one unit there
Reply #42025-12-11
【Haichuan Chemical Technical Documentation】Which rotating equipment requires an online condition monitoring system? Let’s see what the specifications say! ! ! https://bbs.hcbbs.com/thread-5707977-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52025-12-11
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-11
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first 50,000 tons/year facility for producing anhydrous ethanol through synthetic gas biofermentation successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-11
【Ten Years of Rapid Development in Chemical Processing Equipment】The first national \"5G + Industrial Internet\" smart coking system was put into operation in 2025 – a project with an annual production capacity of 3.6 million tons of compacted coke. https://bbs.hcbbs.com/thread-5706895-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-13
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2894-2025: SINOPEC CRIC Builds the World’s Largest and Heaviest EO Reactor https://bbs.hcbbs.com/thread-5708001-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.