The absorption tower for the 1,349-ton coal-coke hydrogen production unit at the Zhenhai base was hoisted into place

2020-10-08View Original

Thread Content

According to Sinopec News Network (Zhang Jianming), at 13:07 on September 27, after 3 hours and 50 minutes of lifting operations, the shift gas absorption tower of the coal-coke hydrogen production unit at the Zhenhai facility was successfully installed in place. The tower has a net weight of 1,170 tons, a lifting weight of 1,349 tons, a height of 99.2 meters, a maximum diameter of 4 meters, and a maximum wall thickness of 96 millimeters. This is the first lift for the coal-coke hydrogen production unit at the Zhenhai facility; it is also the first time that a 4,000-ton class crawler crane and a 1,000-ton class tail hook crane have been used together to lift such large-scale equipment in a project at the Zhenhai facility. From design and manufacturing to the successful installation of this 1,000-ton heavy equipment on schedule, it fully demonstrates the integrated capabilities of Ningbo Engineering Company of the Refining & Chemical Engineering Group. This custom-made equipment was manufactured by the company’s Ningbo Tianyi Manufacturing Factory, and was delivered to the installation site as scheduled on August 29. After the equipment was delivered to the installation site, the project department at the company’s Zhenhai base immediately organized the construction units to launch a rapid effort to prepare the equipment for use. Teams such as Party member vanguard teams, task-force teams for overcoming challenges, teams responsible for setting up scaffolding, teams for pipeline installation, and youth teams were formed to carry out various construction tasks related to labor protection, process pipelines, and insulation. The construction units involved in the installation of this oversized equipment fully embodied the \"4-1 spirit\" of being one family, sharing one heart, combining one effort, and pursuing one goal; by working in two shifts, they ensured that the lifting of this oversized equipment was carried out on schedule.
Reply #22020-10-08
22222222222222
Reply #32020-10-08
This should be the second set ====================== On January 31, 2019, Zhenhai Refining & Chemical’s newly built coal-coke hydrogen production unit was successfully commissioned for the first time, producing qualified hydrogen that was integrated into the plant’s overall hydrogen system. This facility is China’s first hydrogen production plant for coal and coke using domestically developed high-pressure water-coal slurry technology, and its successful commissioning is of great significance. Designed to produce 120,000 standard cubic meters of hydrogen per hour, this facility will play a key role in ensuring the production of clean products such as those meeting National VI standards at Zhenhai Refining & Chemical Co., Ltd.
Reply #42020-10-08
The equipment from three years ago was still lifted in sections
Reply #52020-10-08
Question: What technology is commonly used in domestic coal and coke-based hydrogen production plants? Answer: Domestic coal and coke-based hydrogen production plants generally use technology imported from abroad. Question: What technology is used in this device? Answer: It is a Sinopec-owned technology developed through collaboration between Sinopec and East China University of Science and Technology. Question: Are there any technical advantages? Answer: Compared with similar technologies, \"two highs, two lows, and one long\" features high gasification efficiency, high effective gas yield, low coal consumption, low oxygen consumption, and a long service life for refractory bricks.
Reply #62020-10-08
On February 20, the No. 1 vaporizer in Zhenhai Refining & Chemical’s coal-coke hydrogen production unit was successfully fed with material, producing qualified hydrogen that was fed into the pipeline network, thus officially initiating operation in a dual-vaporizer mode. On January 30, after the successful feeding of the second vaporizer in the coal-coke hydrogen production unit, the staff on duty made every effort to ensure its smooth operation. This device is part of the headquarters’ “Ten Dragon Key Project”; many of the technologies used are being applied for the first time, with no existing experience to draw on. Moreover, it was launched during the Spring Festival holiday, preventing suppliers from providing timely technical support, which placed great pressure on ensuring smooth operations. The equipment team took initiative without waiting for instructions or relying on others; they conducted thorough research and repeated tests, and successfully resolved various challenges such as blockages in the inlet ducts of the coal mills, blockages in the air cooling systems for syngas, crystallization-induced blockages in the ammonia-containing wastewater pipelines, and high vibration levels in the methanol-poor pumps. While ensuring the stable operation of Reactor No. 2, it laid a solid foundation for the commissioning of Reactor No. 1. To successfully complete the production targets for March, Zhenhai Refining & Chemical decided to put the second gasifier into use. Drawing on previous experience and the characteristics of the facility, the team developed a detailed feeding plan, thereby enabling the operation in a \"dual-furnace\" mode. To date, the device has been operating stably for over 20 days, supplying nearly 2,400 tons of hydrogen to the company, thus initially achieving the goal of stable operation. (Source: Sinopec News Network)
Reply #72020-10-08
On February 10, 2020, the total amount of hydrogen produced by Zhenhai Refining & Chemical’s coal-coke hydrogen production unit exceeded 60,000 tons. This device is part of Sinopec’s “Ten Dragon” key project; it began operation on January 31 last year and successfully produced qualified products. At the end of last year, it passed the expert evaluation conducted by the group company’s Science and Technology Department, thus completing the project successfully. Over the past year since the device began operating, its maintenance team has taken the initiative to tackle challenges head-on, carefully identify potential risks, and work to resolve them one by one. Recently, the plant team, in collaboration with relevant functional departments, has successively resolved issues such as blockage at the outer ring end face of the burner, poor quality of coal slurry, and corrosion in the shift condensate pipelines, thereby ensuring the stable operation of the plant. Since the Spring Festival, there has been a shortage of water-coal slurry additives for the plants; these additives need to be supplied to the plants continuously on a 24-hour basis, and any interruption in supply will result in the plants having to stop operating. Together with the Procurement Center, the Ministry of Chemical Industry actively contacts manufacturers, adjusts production capacity and workforce arrangements, and ensures continuous operation of the facilities while implementing epidemic prevention measures. Furthermore, building on the successful 75% coke blending tests conducted in single reactors earlier on, the plant began actual coke blending operations on February 4th, thereby resolving the issue of difficulties in shipping petroleum coke. At present, the plant is operating steadily, producing 81,000 standard cubic meters of hydrogen per hour. The coal coke hydrogen production unit utilizes technology independently developed by Sinopec. As an important unit in the project cluster aimed at restructuring, upgrading, and improving the operations of the old areas at Zhenhai Refining & Chemical Company, this facility was under EPC general contracting by Ningbo Engineering Company. The first pile was driven on August 16, 2016; construction was completed on December 28, 2018, and the facility was successfully commissioned on January 31, 2019, on the first attempt. Article source: Sinopec News
Reply #82020-10-08
This post was last edited by Desert Fish on 2020-10-8 at 19:13:333333333
Reply #92020-10-11
Which technology is used for PSA?
Reply #102020-10-24
Learn together*, improve together! Happy communication, happy sharing!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.