What are the essential resource requirements for applying for a special equipment production license for factory-prepared pipe sections?

2021-10-18View Original

Thread Content

According to the \"Rules for Licensing Production and Filling Units of Special Equipment\" (issued on May 13, 2019), factory-prepared pipe sections refer to pipe component products that are welded and assembled by the manufacturing unit in a factory based on the construction design drawings before being shipped out as complete units; this does not include pipe prefabrication carried out by the installation unit at the construction site.
Reply #22021-10-18
I really didn’t know there were so many strict requirements; most construction companies build a prefabrication plant around their temporary facilities, claiming to be practicing \"factory-based prefabrication\".
Reply #32021-10-18
What you’re referring to is pre-fabrication of the project on-site; if it’s in a different location, then an application needs to be submitted, just like in the case of pressure vessels
Reply #42021-10-18
There was once an order from the EU for \"factory-prepared pipes,\" and no domestic company was able to provide a quote, as it was not possible to determine the volume of work within the given deadline for quoting.
Reply #52021-10-18
Things like this that can be valued, with a fixed unit price and an estimated total price
Reply #62021-10-18
This post was last edited by The wise are enlightened on 2021-10-18 at 13:43. A fixed price is relatively reasonable, but in order to shift risks, the foreign party requests a fixed lump-sum price in its quotation.
Reply #72021-10-18
In that case, a thorough analysis is necessary, involving the estimation of work volumes based on similar projects; at the same time, limits for variations must be established, such as for variations in thick-walled pipes
Reply #82021-10-18
The project is very complex; there is no mature manufacturing process involved, and it constitutes a pilot-scale industrial testing facility. As a result, foreigners are reluctant to take on the risks and prefer to pass on this troublesome task to suppliers, even if it means lower profits.
Reply #92021-10-19
Factory-prepared pipe sections for component assembly devices 1. Establish a system. A quality assurance engineer is required to have an intermediate professional title. Equipped with personnel in design, materials, manufacturing processes, welding, heat treatment, non-destructive testing, pressure testing, physical and chemical analysis, inspection and testing, as well as equipment management. Among them, those responsible for design, technology, and welding must have a degree in a science or engineering field and hold the title of assistant engineer. If the requirements for the above professional titles are not met, it is possible to substitute them with a degree in science or engineering along with relevant years of work experience. 2. Technical personnel: not less than 5 people. 3. Non-destructive testing: RT or UT – no less than 2 personnel; 2 RT machines and 2 UT machines. If the enterprise conducts non-destructive testing on its own, there must be no fewer than 2 Level II personnel for each corresponding project. This can be outsourced. 4. Physical and chemical testing: There should be no less than 2 personnel responsible for mechanical and chemical analysis; chemical analysis instruments or quantitative spectroscopic analyzers are required, along with 2 portable hardness testers and 1 material testing machine. This can be outsourced. 5. Welders, not less than 6 persons. 6. Equipment: 1 submerged arc welder, 2 TIG welders or gas shielded welders, 1 pipe bending machine, 1 heat treatment furnace, and 2 electric heaters equipped with control cabinets. 7. Design capability: Can be outsourced

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.