HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Yunnan Guanyi Silicon Materials Co., Ltd.’s 150,000-ton water glass and 100,000-ton carbon dioxide-based silica project

2025-12-29View Original

Thread Content

Yunnan Guanyi Silicon Materials Co., Ltd.’s 150,000-ton sodium silicate and 100,000-ton carbon dioxide-based silica project: This project is located in the Yuezhou Chemical Industry Park within the Qilin Industrial Park in Qilin District, Qujing City, Yunnan Province, and it was invested in and constructed by Yunnan Guanyi Silicon Materials Co., Ltd. The project is constructed in two phases. Phase 1 involves building a production line capable of producing 150,000 tons of water glass per year (1 production line for 75,000 tons of solid water glass and 1 production line for 75,000 tons of wet-process water glass), a 60,000-ton carbon dioxide production line, and a 50,000-ton carbon dioxide-based acid-process silica production line. Supporting facilities such as production workshops, R&D buildings, as well as systems for water supply, power supply, and environmental treatment are also constructed. Phase 2: Construct a 50,000-ton per year production line for acid-process silica gel using carbon dioxide, along with supporting facilities such as production workshops and environmental treatment systems. The project investment amount is 759.018 million yuan.
Reply #22025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-29
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】Domestically developed unmanned emergency rescue equipment set released for the period 2023–2025: https://bbs.hcbbs.com/thread-5709649-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-30
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling TeTu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #82025-12-30
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs Achieved from 2935 to 2025! The first phase of pipeline laying for China’s largest offshore pipeline project has been successfully completed. https://bbs.hcbbs.com/thread-5709667-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #92025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first large-scale floating platform made of basalt steel for deep-sea aquaculture was launched in 2025: https://bbs.hcbbs.com/thread-5709754-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: Huchuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.