The Dunhua Gas Technology Co., Ltd. in Shihezi City has invested a total of 1,006.8 million yuan in a research and demonstration project focused on the entire chain of technologies for carbon dioxide capture, dense-phase pipeline transportation, oil displacement, and sequestration – involving 2.8 million tons of carbon dioxide

2025-12-21View Original

Thread Content

2.8 million tons of carbon dioxide capture, dense-phase pipeline transportation, oil displacement, and sequestration – full-chain technology research and demonstration project. This project is located in the Shihu Tan New Materials Industry Park in Shihezi City, Xinjiang, and was invested in and constructed by Shihezi Dunhua Gas Technology Co., Ltd. Construction scale: Construction of 2.8 million tons of CO2 capture capacity, approximately 249 km of pipeline network, and related facilities ; Construction contents: Two carbon dioxide capture stations, including two sets of drying and dehydration systems, one set of PSA adsorption and desorption system, two sets of centrifugal compressors, two sets of normal-temperature refrigerators, two sets of circulating water systems, a power distribution room, and a centralized control room; the annual capacity for capturing carbon dioxide is 2.8 million tons. The carbon dioxide pipeline is approximately 249 kilometers in length, with 5 stations along its route (including Tianchen Start Station, Tianye Central Station, Shixi Transfer Station and Pigging Station, Luliang Transfer Station, and Mahu End Station), as well as 5 valve rooms. There are also 3 refrigeration stations, along with utility systems, electrical and automation equipment, and various other auxiliary devices. The total investment for the project is 1,006.8 million yuan.
Reply #22025-12-21
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHIHE Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-21
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42025-12-21
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsecured and Not Properly Sealed Aluminum Insulation Layers for Pipes https://bbs.hcbbs.com/thread-5708978-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-12-21
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-12-21
【Ten Years of Rapid Development in Chemical Equipment】2907-2025: China’s First Civilian Liquid Hydrogen Plant Obtains Safety Production Permit https://bbs.hcbbs.com/thread-5708618-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #72025-12-22
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s largest 9600 Nm³/h multi-functional hydrogen production BOP system was successfully delivered https://bbs.hcbbs.com/thread-5708761-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2009 to 2025, Ningmei Group made significant progress in the key technologies related to the extraction of rare gases such as krypton and xenon from ultra-large air separation units. https://bbs.hcbbs.com/thread-5708777-1-1.html (Source: Hchuan Chemical Industry Forum (Hchuanliu hcbbs))
Reply #92025-12-22
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestic emergency drill on land for 1,500-meter-class ultra-deep-water submarine pipelines was successfully carried out from 2010 to 2025. https://bbs.hcbbs.com/thread-5708788-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-23
【Ten Years of Rapid Development in Chemical Equipment】2891-2025: Filling Technical Gaps! ! ! Our country conducted the first full-scale test of leak-induced jet fire in high-pressure pure hydrogen pipelines https://bbs.hcbbs.com/thread-5707712-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #112025-12-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.