HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is the hanging base for the ammonia synthesis tower, the core equipment in the Baling Hengyi technical upgrade project? Which company manufactured it?

2021-11-24View Original

Thread Content

The core equipment of the Baling Hengyi technical upgrade project is the ammonia synthesis tower, which has a diameter of 2.4 meters and a height of 25 meters; it consists of a hanging base, the tower body, and other components
Reply #22021-11-25
This is an installation picture found online
Reply #32021-11-26
It seems like the tower is fixed to the frame; is this done to save space and facilitate the arrangement of pipes?
Reply #42021-11-26
There are no pipes on the top of the equipment; they are mainly on the sides and bottom

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.