Discussions sparked by this post 【Haichuan Insights】Processing of the head for the world’s tallest tower structure https://bbs.hcbbs.com/thread-3280765-1-1.html (Source: Haichuan Chemical Industry Forum) How should the welding sequence be determined for an elliptical head with a diameter of 13,800 mm and a thickness of 104 mm? What kind of heat treatment is required?
Therefore, assembly, welding, non-destructive testing, and heat treatment are extremely important. Failure is not allowed
It should follow a welding sequence and method similar to those used for spherical tanks, along with overall heat treatment.
Guess whether this end cap was welded manually or automatically? ? ?
External soft insulation material, internal fuel atomization for combustion.
With such flat equipment, using the fuel method may result in poor gas distribution
This post was last edited by CHANGBAISHI on 2021-12-20 08:48. This welding is not done in a single pass; two large grooves are required on each side. If it is done by manual welding, the payment is calculated on a per-centimeter basis. Assembly involves welding clamps on the plate surface, and then connecting the components together using wedges. After welding, it is heated from the inside using liquefied gas or similar, and insulated from the outside with glass wool. A giant – I’ve heard that nuclear reactors have such things,,,