【Major Industrial Equipment in the Chemical Industry】241 – CCTV News reports on the overall modular construction of Yancheng’s largest storage tank with a capacity of 270,000 cubic meters

2022-05-17View Original

Thread Content

This post was last edited by Desert Fish on 2022-5-29 at 11:57. Related links to 1933 can be found on the 2nd and 3rd floors: Workers in the chemical industry’s Red May! Reply reward! ---------------------------------------------- The past decade has been a period of rapid development in China’s chemical industry, marked by the emergence of many new processes, products, and equipment. There has also been significant progress in China’s chemical processing equipment, which has contributed to the swift advancement of the petrochemical sector. Here, we have compiled some of the achievements and breakthroughs made by Chinese equipment manufacturers in terms of larger-scale production and increased use of domestic equipment. We invite everyone to share their insights and engage in discussions, to cheer for Made in China and to support the development of chemical processing equipment! =====================
Reply #22022-05-17
【Major Equipment in the Chemical Equipment Industry】Video of the overall modular construction of Yancheng’s largest storage tank with a capacity of 270,000 cubic meters, as reported by CCTV News: 2 https://bbs.hcbbs.com/thread-3344278-1-1.html (Source: Huahai Chuanliu – Haichuan Chemical Forum Website)
Reply #32022-05-17
【Major Industrial Equipment in the Chemical Industry】Video of the overall modular construction of Yancheng’s largest storage tank with a capacity of 270,000 cubic meters, as reported by CCTV News: https://bbs.hcbbs.com/thread-3344279-1-1.html (Source: Huahai Chuanliu – Haichuan Chemical Forum Website)
Reply #42022-05-17
Xinhua Finance, Beijing, May 17 (Reporter: Anna) The installation of the vault modules for all six liquefied natural gas (LNG) storage tanks in China, each with a capacity of 270,000 cubic meters and designed and built domestically, was completed on May 17 at CNOOC’s Yancheng “Green Energy Port”. Yuan Bin, deputy general manager of CNOOC Yancheng’s “Green Energy Port” project, explained that the dome is an important component of liquefied natural gas storage tanks, acting as the \"beam\" of such tanks. Given the long span and heavy weight of the dome modules for this 270,000 cubic meter large-capacity storage tank, the project team, through precise calculations, simulation studies, and on-site tests, arranged 3 sets of 8 lifting points in a proper upper, middle, and lower configuration on the surface of each dome module. Before lifting, the lengths of the 8 steel cables were adjusted to keep the angle between each set of cables constant, ensuring that the deformation of the dome modules during lifting remained within 5%, thus guaranteeing the construction quality. Furthermore, according to information provided by CNOOC, this lifting operation overcame challenges such as limited space, poor geological conditions, numerous concurrent tasks, and long lifting times, and successfully carried out the simultaneous lifting of three tank roof modules for the first time in China. The innovative structural design and construction methods for prefabricated vault modules reduce the amount of welding work by nearly 83%, significantly improving the efficiency of installation inside the tank while reducing operational risks. The successful lifting of the dome module laid a solid foundation for subsequent processes such as pneumatic jacking, dome pouring, and interior tank construction. Data shows that the first phase of CNOOC Yancheng’s “Green Energy Port” project involves the construction of 10 large-scale LNG storage tanks, including 4 tanks with a capacity of 220,000 cubic meters each and 6 tanks with a capacity of 270,000 cubic meters each. Once all these tanks are in operation by the end of 2023, the annual LNG processing capacity will reach 6 million tons, which is equivalent to 8.5 billion cubic meters of gaseous natural gas – enough to meet the energy needs of Jiangsu province for approximately 28 months. Industry experts say that CNOOC Yancheng’s “Green Energy Port” is a key project under the plan to develop a system for the production, supply, storage, and distribution of natural gas, as well as to facilitate connectivity between various facilities. Once completed, it will play an important role in optimizing the energy structure, protecting the ecological environment, accelerating industrial transformation in the Yangtze River Economic Belt, and helping China achieve its “dual carbon” goals.
Reply #52022-05-17
@RedLee_ZZHI @WisdomBright @BookBoy @MightyUltraman. @Storage and transportation engineer @Nut: This was done quite quickly – the foundation was completed in 60 days, while the bottom plate, shell, and tank top were welded together in 90 days. Well done!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.