【HaiChuan Chemical Project Updates】Another new project in Hami, Xinjiang: Nuomaohu invests 4.5 billion yuan; Xuan Dong Energy receives environmental approval

2022-06-27View Original

Thread Content

In June 2022, the Xinjiang Department of Ecology and Environment issued a approval notice regarding Xinjiang Xuan Dong Energy Co., Ltd.’s project for the clean and efficient utilization of coal on a scale of 10 million tons per year, as well as a project for producing hydrogen through gasification at a rate of 100,000 m3/h. Xuandong Energy Co., Ltd. is constructing the project for the clean and efficient utilization of coal on a scale of 10 million tons per year, with differentiated quality treatment, as well as the hydrogen production via gasification at a rate of 100,000 m3/h, in three phases. The total investment for the project is 4,490 million yuan, of which 852 million yuan is allocated to environmental protection measures, accounting for 18.98% of the total investment. According to the publicly available environmental impact assessment information, coal-to-hydrogen production utilizes SE water-coal slurry gasification, sulfur-tolerant shift reaction, low-temperature methanol washing, and PSA for hydrogen production.
Reply #22022-06-27
The equipment allocation for each process stage of the project is as follows: Gasification – 2 gasification furnaces, with a water-cooled wall and lower cooling system; 2 units in operation and 1 as backup. Transformation: Sulfur-resistant transformation, CO+H2 110,000 m3/h. Purification: Low-temperature methanol washing for CO+H2, 110,000 m3/h. PSA hydrogen production: 100,000 m3/h. Sulfur recovery: two-stage Claus process for sulfur production.
Reply #32022-06-27
Xinjiang Xuan Dong Energy’s 100,000 Nm³/h coal gas-to-hydrogen project is located in the comprehensive energy industry zone of the Yiwu County Industrial Park in Hami. It is primarily used to supply hydrogen for the coal tar hydrogenation unit part of Xinjiang Xuan Dong Energy’s project for the clean and efficient utilization of 10 million tons per year of coal on a differentiated basis. This project includes process units such as air separation, coal preparation, gasification, shift reaction, low-temperature methanol washing, sulfur recovery, and PSA hydrogen production, along with the supporting utility systems. The air separation unit has a capacity of 40,000 Nm³/h (O₂), and it supplies process air, instrument air, and nitrogen for the entire plant.
Reply #42022-06-27
Xinjiang Xuan Dong Energy Co., Ltd. – 10 million tons per year project for the clean and efficient utilization of coal through classification and quality differentiation. Project name: 10 million tons per year project for the clean and efficient utilization of coal through classification and quality differentiation. Planned start and completion dates for the project: July 2020 – October 2023. Location of the project construction: Naomaohu Comprehensive Industrial Zone, Yiwu County Industrial Park, Hami City. Project construction scale: Clean and efficient utilization of 10 million tons per year of coal, differentiated by grade and quality, to be built in three phases. The first phase involves the construction of a coal grading and quality-based utilization facility with an annual capacity of 3 million tons, as well as a gasification hydrogen production facility with a capacity of 100,000 Nm3/h, along with some supporting utility systems and auxiliary production facilities ; Phase II construction of a 3 million tons per year coal grading and quality-based utilization facility, along with associated utility systems and auxiliary production facilities ; Phase 3 involves the construction of a coal grading and quality-based utilization facility with an annual capacity of 4 million tons, as well as an LNG facility with an annual capacity of 200,000 tons, along with the associated utility systems and auxiliary production facilities.
Reply #52022-06-27
The contents of the first phase of the project mainly include: (1) the main construction works, which involve building a coal grading and quality separation facility with an annual capacity of 3 million tons, as well as a gasification hydrogen production facility with a capacity of 100,000 Nm3/h; (2) Utility systems, including newly built deaerated water systems, desalinated water and condensate systems, circulating water stations, control systems, air separation systems, etc ; (3) Auxiliary works, including new water supply systems, power supply systems, and facilities for living and office use ; (4) Storage and transportation engineering, including new construction of raw coal storage, pulverized coal storage, upgraded coal storage, pipeline projects, etc ; (5) Environmental protection projects, including waste gas, wastewater, and noise control facilities required for new production lines, new solid waste storage facilities for the entire plant, environmental risk prevention measures, and emergency response measures in case of accidents.
Reply #62022-06-27
The contents of the second phase of this project mainly include: (1) the main project, which involves the construction of a new facility for the classification and quality-based utilization of coal with an annual capacity of 3 million tons; (2) Utility systems, including the construction of new circulating water stations, control systems, air separation systems, etc ; (3) Auxiliary works: water supply system, power supply system, and office and living facilities relying on the facilities already built in Phase I ; (4) Storage and transportation engineering, including the construction of new facilities for storing raw coal, pulverized coal, and upgraded coal; pipeline projects will make use of the infrastructure already built in Phase 1 ; (5) Environmental protection projects, including waste gas, wastewater, and noise control facilities required for new production lines, as well as measures to prevent environmental risks associated with solid waste storage facilities and emergency response plans, all of which are based on the construction elements of Phase 1.
Reply #72022-06-27
The contents of the third phase of this project mainly include: (1) the main construction works, which involve building a facility for the graded and differentiated utilization of 4 million tons per year of coal (coal dust) as well as a facility for converting 200,000 tons per year of waste gas into LNG; (2) Utility systems, including the new waste heat steam system, desalination station, and air/nitrogen station, etc ; (3) Auxiliary works: water supply system, power supply system, and office and living facilities relying on the facilities already built in Phase I ; (4) Storage and transportation engineering: intermediate product tank areas, product tank areas, finished product warehouses, etc.; other storage and transportation systems rely on the facilities already built in Phase I ; (5) Environmental protection projects, including waste gas and noise control facilities to support the new production lines; wastewater treatment facilities based on the construction plans for Phase 2; as well as environmental risk prevention measures and emergency response measures for solid waste storage facilities, which are based on the construction plans for Phase 1.
Reply #82022-06-27
The 100,000 m3/h coal gasification hydrogen production project supplies hydrogen for the coal tar hydrogenation unit. Is a separate subsidiary project being created in an attempt to associate itself with concepts such as hydrogen energy and low carbon emissions?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.