Thread Content
On November 20, 2020, with the final dealkylation tower passing the acceptance tests, the super-large-scale towers for the ethylene glycol production unit of the 1.8 million tons per year ethylene glycol project at Shaanxi Coal Yulin Chemical, manufactured by Lansi Heavy Equipment’s mobile factory, were successfully delivered. The project features a total of 12 super-sized towers, with a combined weight of around 3,800 tons. All of these towers are made of large-diameter, thin-walled composite panels; among them, there are 3 methanol recovery towers, 6 alcohol removal towers, and 3 ethylene glycol production towers.
It’s tough in the scorching summer heat! Keep up with heat prevention and cooling! Clarify the key tasks! Safety analysis must not be neglected! ---------------------------------------------- The past decade has been a period of rapid development in China’s chemical industry, with the emergence of many new processes, products, and equipment. China’s chemical processing equipment has also seen significant progress, which has contributed to the swift advancement of the petrochemical sector. Here, we have compiled some of the achievements and breakthroughs made by Chinese equipment manufacturers in terms of larger-scale production and greater use of domestic equipment. We invite everyone to share their insights and discuss these topics together; let’s cheer for Made in China and support the development of chemical processing equipment! ------------------------------------------------------ 【Ministry of Emergency Management’s Special Inspection 2022】Summary Edition – Feel free to join the discussions and conduct self-inspections! ! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=3418729 (Source: Huahai Chuanliu – Haichuan Network) Summary post for the 【Major Chemical Equipment in China】 series; being updated. https://bbs.hcbbs.com/thread-3366481-1-1.html (Source: Huahai Chuanliu – Haichuan Network)
On March 29, 2020, the spherical head and shell-side cylinder of the ethylene glycol synthesis tower – the key oversized equipment for Yulin Chemical’s 1.8 million tons per year ethylene glycol production project – were successfully transported to the large-scale equipment welding and assembly facility at the project site, marking the entry of this project’s equipment into the phase of on-site assembly and manufacturing. The ethylene glycol synthesis tower for oversized equipment was manufactured by Zhanghua Machinery (Suzhou) Reassembly Co., Ltd. What is being delivered this time are the spherical head SR3114×75 for the ethylene glycol synthesis tower, as well as the shell-side cylinder IDN6200×110×2632. There are two heads in total, one at the top and one at the bottom; each head weighs 45 tons and is composed of 8 segment pieces and 3 end rings ; The shell section of a single cylinder is divided into 2 pieces, with a thickness of 110 mm. All the equipment delivered to the site is prefabricated and pre-assembled by the manufacturer in advance, and then transported to the large-scale assembly and welding workshop at the project site for further assembly and welding. Next, Jiangsu Yongda Chemical Machinery Co., Ltd., Lanzhou Lanshi Heavy Equipment Co., Ltd., and Xi’an Nuclear Equipment Co., Ltd. will also move into the company’s large-scale equipment welding and assembly plant one after another to commence intensive equipment manufacturing work. Zheng Baoxiang, deputy general manager of Yulin Chemical Company, attended the delivery ceremony and delivered a speech. He noted that the successful delivery of the first batch of oversized equipment is a milestone in achieving all the set goals on schedule. Next, the company will provide full support and guarantees in terms of personnel, resources, equipment, and organizational structure on site, to create favorable conditions for the assembly of the oversized equipment there as well as for the lifting operations that follow. He stated that the current project construction has entered a critical phase, and all parties involved must pay close attention to the organization of on-site work, overcome difficulties, and strive hard to work together toward achieving the \"21630\" goal.