HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Ten Years of Rapid Development in Chemical Processing Equipment】The first-phase aerospace furnace at Anhui Haoyuan set a new world record for prolonged operation period from 2016 to 2022

2022-12-15View Original

Thread Content

Witness the decade-long rapid development of chemical processing equipment; praise the prosperity and strength of modern China. Replies will be rewarded – discussions are welcome. ------------------------------------------- The record-breaking long-term operation of the aerospace furnace in Phase 1 of Anhui Haoyuan. Construction of the aerospace furnace project in Phase 1 of Anhui Haoyuan began in November 2011, was fully completed in October 2012, and trial operations started in March 2013. Anhui Haoyuan Phase I project is a reform project for the synthetic ammonia feedstock route; it utilizes one (Φ2800×3200 type) aerospace powder gasifier, and began operations with feedstock feeding in March 2013. Due to its stable operation, Anhui Haoyuan promptly commenced the construction of the second phase of the space furnace, which was put into operation on April 23, 2014. The success of the first phase of the space furnace project in achieving 320 days of continuous operation can be attributed largely to meticulous management. This is attributed both to the improved proficiency of the employees operating the existing equipment, and to the four refined management systems implemented by Anhui Haoyuan. First, implement refined management of electrical instruments. Second, implement refined management of operator training. Third, implement precise management of operational discipline. Fourth, implement refined management of coal types and coal blends. On October 18, 2016, a power outage in the external grid brought an end to the continuous operation of the space furnace, which had been running since December 2, 2015; as a result, its total period of continuous operation amounted to 320 days. As of April 8, 2017, the 24/7 continuous operation of Phase 1 of the Haoyuan project, undertaken by China Aerospace Changzheng Company, has now reached 416 days, surpassing the record of 407 days set by the Manas project in 2017. In November 2022, the \"spacecraft furnace\" unit at the Anhui Haoyuan project was able to operate at full capacity for a consecutive period of 485 days, setting a new world record for the continuous operation time (Class A) using gas-flow bed gasification technology.
Reply #22022-12-18
【Ten Years of Great Development in Chemical Equipment】Ongoing update of the summary post; feel free to join the discussion: https://bbs.hcbbs.com/thread-3576046-1-1.html (Source: Haichuan Network – Chemical Industry Forum)
Reply #32022-12-19
In November 2022, the \"spacecraft furnace\" unit at the Anhui Haoyuan project was able to operate at full capacity for a consecutive period of 485 days, setting a new world record for the continuous operation time (Class A) using gas-flow bed gasification technology.
Reply #42022-12-19
Thank you for sharing. The emergence of domestic space furnaces has shattered the myths surrounding Shell, GSP, and Collin – keep it up!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.