【Ten Years of Rapid Development in Chemical Equipment】From 1984 to 2020, Nanjing produced 340 tons of methanol water-cooled reactors

2023-01-27View Original

Thread Content

Ten years of rapid development in chemical processing equipment – praise for the prosperous and strong China. Wishing everyone a happy New Year, and may their families be safe and healthy. By contributing our ideas, we can create a more lively atmosphere; HaiChuan becomes even better with your participation. Everyone is welcome to join in the forum discussions and exchanges. ********************************************** On July 16, 2020, in Wushen Banner, Ordos, Inner Mongolia, two key pieces of equipment for the methanol project operated by China Five Rings Company – the methanol water-cooled reactors – were successfully delivered to the project site. This marked an important milestone in the project’s “100-day campaign”. The methanol water-cooled reactor is the core equipment of a methanol synthesis plant. The methanol water-cooled reactor for this project has a diameter of 4.5 meters and a height of 16 meters; its weight is 340 tons per unit. The reactor cylinder is made of chromium-molybdenum steel, the heat exchange tubes are made of imported duplex steel from Europe, and the tube sheet is also made of chromium-molybdenum steel. The technical requirements are high, the manufacturing process is complex, and the delivery time is as long as 18 months.
Reply #22023-01-27
The second-phase construction project of China Coal Energetic Chemicals Company, which involves technological upgrades for the production of 1 million tons of methanol per year from syngas, is located in the Tuk Industrial Park in Ordos, Inner Mongolia. Land for this second phase has been reserved next to the facilities from the first phase, covering an area of 25.13 hectares. The project utilizes Zemach BGL fixed-bed slag gasification technology, purification technologies (low-temperature methanol washing + deep cryogenic methane separation), as well as advanced methanol synthesis technologies with low consumption and energy use, to build an MTO-grade methanol plant with an annual production capacity of 1 million tons. On September 21, 2018, the groundbreaking ceremony was held for the technical upgrade project at China Coal Ordos Energy Chemical Co., Ltd., aimed at producing 1 million tons of methanol per year from syngas. The main units include: a 1 million tons per year methanol production plant, which comprises an air separation unit, a gasification unit (for gasification, gas-water separation, phenol and ammonia recovery, coal gas compression, shift reaction and cooling, chemical deoxygenation station, integrated tank farms, gasification slag disposal, and gasification flares), a purification unit (low-temperature methanol washing and RTO systems for flue gas combustion), a cryogenic separation unit (for methane cryogenic separation and LNG tank farms), a sulfur recovery unit, and a methanol synthesis unit (for syngas compression, methanol synthesis, refrigeration processes, hydrogen recovery, intermediate methanol tank farms, and finished methanol tank farms). The Zhongmei Energhua project, with an annual production capacity of 2 million tons of ammonia and 3.5 million tons of urea, was constructed in two phases. The first phase, which has an annual production capacity of 1 million tons of ammonia and 1.75 million tons of urea, includes two air separation units with a capacity of 40,000 Nm3/h each; these units were completed and put into operation in 2013. Meanwhile, some of the public facilities required for the second phase as well as all the office and living facilities have already been built. Based on the current market conditions and operational status, Phase II of the project plans to shift from producing synthetic ammonia and urea to manufacturing 1 million tons of methanol, thereby supplying MTO-grade methanol feedstock to the olefin plants of China Coal Mengda Company.
Reply #32023-01-27
The methanol plant was designed by China Fifth Ring Engineering Co., Ltd. and supervised in construction by Beijing Zhongheng Xinda Project Management Co., Ltd. The equipment was manufactured by the Chemical Machinery Factory of Sinopec Nanjing Chemical Industry Co., Ltd., with a production period of 16 months. This equipment serves as the core reaction vessel for producing methanol from syngas; catalysts are added to the syngas within this vessel to yield methanol of suitable quality. The heat exchange tubes of this equipment are imported from Germany, and their manufacturing process is based on Lurgi’s patents. It is a complex process with a long production cycle, high difficulties, and a high level of technical complexity; it represents the most critical core equipment in methanol production projects.
Reply #42023-01-27
On July 24, 2022, the core equipment of the methanol synthesis unit for the China Coal Hubei Energy Chemicals project – a 320-ton water-cooled methanol synthesis reactor – was successfully hoisted into place.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.