Thread Content
On May 24, 2023, after 50 days, the high-quality and high-standard 1000-2000Nm?/h large-scale water electrolysis hydrogen production test center independently built by Yili Hydrogen Field Times Technology Co., Ltd. completed system debugging and successfully entered the project acceptance stage, marking the completion of the construction of the first comprehensive large-scale water electrolysis hydrogen production test base in the Inner Mongolia Autonomous Region. The testing center will provide all-round, high-standard quality inspection support for the hydrogen production equipment manufactured by Yili Hydrogen Field Times Company, ensuring the performance reliability and consistency of the factory products, providing users with on-site quality inspection, simplifying the user inspection process, and saving users’ acceptance costs. The Hydrogen Field Era Test Center is located in Yili Kubuqi Industrial Park, Ordos City, covering an area of 600 square meters, including a movable electrolyzer installation area, a 1000-2000Nm3/h hydrogen production post-processing (BOP) system, a voltage transformation room, a rectification room, a hydrogen production automation control room and a replenishment system. In the water distribution and alkali room, the test center uses 35KV high-voltage electricity delivered by the power plant in the park. It is transformed and rectified to provide continuous power demand for the electrolyzer. At the same time, the circulating cooling water and pure water of the test center are all fully supplied by the water system of the Yili Park, ensuring the long-term stable operation of the test center. The completion of the construction of the test center marks that Yili Hydrogen Field Era Company will have the testing capabilities for a complete set of 10MW electrolyzed water systems. The company in the hydrogen field era will carry out professional data verification and effective control of the quality of all factory products from design, manufacturing, testing to certification. It is expected to provide * * The construction of a large-scale electrolyzed water testing center provides mature demonstration significance.