【Ten Years of Great Development in Chemical Technology】The second set of PDH units using the domestic ADHO process from 201 to 2023

2023-08-02View Original

Thread Content

This post was last edited by Desert Fish on 2023-8-2 at 16:17. On July 18, 2023, upon inspection by the owner, it was confirmed that Hohhot Petrochemical Company’s 50,000 tons per year propane dehydrogenation unit had been successfully completed. CNPC Hohhot Petrochemical’s 50,000-ton/year PDH unit – work on this project began in 2020. It utilizes a domestically developed ADHO process; it is the second PDH unit in China to adopt this process, following Puyang Yuandong Technology’s 150,000-ton/year PDH unit. Project Name: Hohhot Petrochemical Company’s 50,000 tons/year Propane Dehydrogenation Project
Owner: Hohhot Petrochemical Company, China National Petroleum Corporation
Nature of Construction: New construction
Scale of Construction: The designed capacity of this facility is 50,000 tons per year. It consists of a reaction and regeneration section, a main fan section, a reaction gas washing section, a waste heat boiler section, a flue gas washing section, and an absorption and stabilization section. Operational flexibility: 75–100%, annual processing hours: 8,400 hours. Construction site: Located in the middle of the existing plant area of Hohhot Petrochemical Company in Jinhe Town, Saihan District, Hohhot City, Inner Mongolia Autonomous Region, on the vacant space to the south of the second combined unit; no new land will be used for construction. The central geographic coordinates of the factory site are 111°44'49" east longitude and 40°43'54" north latitude. Total investment: The total investment for this project is 178 million yuan, of which 3.43 million yuan is allocated to environmental protection measures, accounting for 1.92% of the total investment. Construction period: The construction period for this project is 12 months.
Reply #22023-08-05
【Ten Years of Great Progress in Chemical Technology】China’s first PDH plant using independent ADHO technology was put into operation from 198 to 2023. https://bbs.hcbbs.com/thread-4528173-1-1.html (Source: Haichuan Chemical Industry Forum Website)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.