HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Guangxi Taisheng Green Fiber Full Industrial Chain Base Project

2025-12-29View Original

Thread Content

Project Name: Guangxi Taisheng Green Fiber Full Industrial Chain Base Project
Launch Date: December 29, 2025
Location: Guangxi
Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Fibers/Synthetic Fibers
Project Owner: Taisheng (Guangxi) Bamboo Resources Development Co., Ltd.
Total Investment: 1,567.4 million yuan
Current Progress: Public announcement of the preliminary evaluation results
Construction Location: Wulin Park, Economic and Technological Development Zone, Guigang City, Guangxi Zhuang Autonomous Region
Construction Scope: Construction of a production line for 1 million tons per year of bleached sulfate wood (bamboo) pulp, as well as production lines for 450,000 tons per year of specialty paper and 500,000 tons per year of household paper, along with supporting facilities; Associated alkali recovery workshop (including waste heat power generation system for alkali furnaces) ; Preparation of supporting chemicals such as chlorine dioxide, hydrogen peroxide, and polyaluminum chloride ; Associated water intake facilities, pollution control systems, white clay recovery, and other auxiliary facilities ; The general layout works for the project’s supporting facilities. Progress milestone: December 26, 2025 – Public consultation on the social stability risk assessment for the Guangxi Taisheng Green Fiber full-industry chain base project (Stability Assessment Public Notice)
Reply #22025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first industrial unit for aerospace pyrolysis, under the 2931-2025 project, was mechanically completed in the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia. https://bbs.hcbbs.com/thread-5709594-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #32025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】First-in-China set of unmanned emergency rescue equipment released for 2025 and beyond: https://bbs.hcbbs.com/thread-5709649-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-29
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling Te Tu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: HCBBS Chemical Forum)
Reply #62025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-30
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling Te Tu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: HCBBS Chemical Forum)
Reply #82025-12-30
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs Achieved from 2935 to 2025! The first phase of pipeline laying for China’s largest offshore pipeline project has been successfully completed. https://bbs.hcbbs.com/thread-5709667-1-1.html (Source: HCBBS Chemical Forum)
Reply #92025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first large-scale basalt steel material deep-sea aquaculture floating platform was successfully launched between 2025 and 2937. https://bbs.hcbbs.com/thread-5709754-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #112025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.