Thread Content
Recently, the 100,000 tons per year anthracene oil deep processing and associated waste heat power generation project of Inner Mongolia Yizheng Chemical Co., Ltd. commenced construction. The 100,000 tons per year deep processing of anthracene oil and associated waste heat power generation project by Inner Mongolia Yizheng Chemical Co., Ltd. is located in the Mengxi Industrial Park in Etoke Banner, Ordos City, Inner Mongolia. Using anthracene oil as raw material, this project produces products such as crude anthracene, crystallization-free anthracene oil, refined anthracene, and carbon black; once operational, it will become the largest deep processing facility for anthracene oil in China. This project utilizes waste heat to generate electricity, exploring reasonable operation models for the \"reduction,\" \"resource utilization,\" \"harmlessness,\" and \"industrialization\" of coal tar. It offers significant benefits in terms of energy conservation, emission reduction, and environmental protection, serving as a clear example of green and low-carbon development. Project Overview: This project is located in the Mengxi High-Tech Industrial Park, Ejin Horo Banner, Ordos City. It will be constructed in two phases. The construction scope for Phase 1 includes: a coal tar pretreatment unit with an annual capacity of 200,000 tons, an anthracene oil refining unit with an annual capacity of 50,000 tons, an anthraquinone processing unit with an annual capacity of 0.2 million tons, one special-grade carbon black production facility (including a pigment carbon black production line with an annual capacity of 10,000 tons and a conductive carbon black production line with an annual capacity of 20,000 tons), as well as an exhaust gas power generation unit (including an exhaust gas boiler with a capacity of 20 t/h and a steam turbine generator set). The construction scope for Phase 2 includes: an anthracene oil refining unit with an annual capacity of 50,000 tons, an anthraquinone processing unit with an annual capacity of 0.2 million tons, one special-grade carbon black production facility (including a carbon black production line for fiber plastics with an annual capacity of 10,000 tons, a high-pigment carbon black production line with an annual capacity of 5,000 tons, and a carbon black production line for battery use with an annual capacity of 3,000 tons), as well as an exhaust gas power generation unit (including an exhaust gas boiler with a capacity of 20 t/h and a steam turbine generator set). The main construction components include the main structure, storage and transportation facilities, container-related works, and environmental protection measures. The total investment for this project is 652 million yuan, of which 6.6 million yuan is allocated to environmental protection efforts.