On May 7, Yanyu Energy Company, China National Chemical Corporation Donghua Company, and China Science Synthetic Oil Engineering Co., Ltd. signed the overall design contract for the Yulin coal-to-clean fuel upgrading demonstration project in Hefei, Anhui Province. They also held a meeting to kick off the overall design work, which was chaired by Wen Yaoshun, Deputy Secretary of the Party Committee and General Manager of Yanyu Energy Company. The meeting featured in-depth discussions on various aspects of the overall design, identified key milestones and timeline requirements, formulated a construction plan, and decided to complete the overall design of the project by the end of the year. At the same time, it is required to conduct thorough research and comparison on the process technologies involved in the project, and to focus on designing key aspects such as the project’s design concept, equipment selection, and the construction of an intelligent factory. In terms of the series-based arrangement of the overall installation, ensure that individual series of equipment as well as auxiliary systems can be isolated for maintenance. In terms of the overall layout, careful consideration is given to the effective connection between Phase 1 and Phase 2 of the project, ensuring that the overall design scheme not only meets the objectives of serving as a model for upgrades but also enables safe and stable operation once the project is put into use, thus laying a foundation for the smooth progress of the project’s basic design. It is reported that the Yulin Coal-to-Clean Fuel Upgrading Demonstration Project is a major initiative undertaken by Yan’an Petroleum to meet the requirements for the advanced, diversified, and low-carbon development of the coal chemical industry. The project is located in the Energy and Chemical Industry Park of Jingbian Economic Development Zone in Yulin. It utilizes advanced technologies such as next-generation indirect coal liquefaction, with a planned capacity of 5 million tons per year for the production of clean fuels and chemical products derived from coal. Initially, construction will begin on a project aimed at producing 2.4 million tons per year of coal-based clean fuels and high-end new materials. This project will make full use of Yulin’s advantages in coal resources as well as the group company’s strengths in industrial coordination, and it is of great significance for accelerating the development of Yulin’s energy innovation demonstration zone, promoting economic growth in Shaanxi, and ensuring energy security.
Why didn’t the general institute choose Hualu? Yulin is the realm under Hualu’s complete domination.
Is there too much work to handle, resulting in delays?
Having too many tasks and ignoring delays – these are just superficial issues; the real problem is arrogance! You haven’t seen that expression; I have witnessed it before.